City of <br /> Pequot <br /> Lakes= - <br /> Water/Wastewater Renort <br /> September 2018 <br /> Water Deut. <br /> Facilitv Performance for Au�ust 2018: <br /> Flow <br /> Average daily gallons pumped: 128,000 gallons <br /> Maximum daily gallons pumped: 165,000 gallons <br /> Minimum daily gallons pumped: 98,000 gallons <br /> Total monthly gallons pumped: 3,846,000 gallons <br /> Lab <br /> Average daily chlorine concentration: 0.34(mg/1) <br /> *Recommended cWorine concentration: 0.2 to 0.5 mg/1 <br /> Average daily fluoride concentration: 0.7(mg/1) <br /> �Recommended fluoride concentration: 0.5 mg/1 to 0.9 mg/1 <br /> Wastewater Den� <br /> Facilitv Performance for Au�ust 2018: <br /> Flow <br /> Average Daily Flow: 68,671 gallons (Design—121,795 gaUday) <br /> Maximum Daily Flow: 77,293 gallons <br /> Minimum Daily Flow: 60,197 gallons <br /> Total Monthly Flow: 2,128,813 gallons <br /> Operations Report <br /> 1) Water treatment facility inspections were completed daily. <br /> 2) Wastewater facility and lift station checks were done every Monday,Wednesday,and Friday. <br /> 3) Monthly lift station maintenance(check amps,clean floats,inspect wet well,etc)was completed <br /> on 9/24. <br /> 4) Weekly water testing was completed. <br /> 5) Water meters were read on 9/20. <br /> � Monthly fluoride report was submitted to Minnesota Department of Health on 9/3. <br /> 'n Monthly Discharge Monitoring Report was submitted to MPCA on 9/3. <br /> 8) Quarterly Dischazge Monitoring Report was submitted to MPCA on 9/4. <br /> 9) Annual sewer jetting of the City's gravity sewer lines is complete. We aze still waiting for <br /> delivery of the City's new sewer jetter. <br /> 10) Wastewater spray irrigation will wrap up for the year on September 30�'. The system will be <br /> winterized shortly thereafter. <br /> 11) PRASD operators repaired an aeration line at the City's wastewater ponds. <br /> 12) The tower project is slowly coming along. At the time of this report, all of the priming and <br /> most of the painting is complete. The contractor needs a couple days without rain and too much <br /> wind to finish up. Weather permitting,the project should be complete by the time of the City <br /> Council meeting. Kevin Kangas(coating contractor)has been very good to work with. <br /> Respectfully Submitted by Andrew Schwartz,Operations Manager,Pine River Area Sanitary District <br /> Please feel free to call my cell at 320-232-5787 with any questions/concerns <br /> For 24-hour emergency service call 218-851-9060 <br />