Laserfiche WebLink
AMM� lqp- KM-V, <br />�r <br />lladerson MM Cmish elm Company <br />P.Q. Box 668 <br />Brakwil MN 56401 <br />218- 829 -1768 <br />218 - 829 -7607 Fox <br />To: <br />TDS <br />Contact: C Bob Perkins 851 -4214 <br />Address: <br />30965 2nd St, P.O. Box 395 <br />Phone: <br />Pequot Lakes, MN 56472 <br />Fax: <br />Project Name: <br />TDS <br />Bid Number: <br />Project Location: <br />Pequot Lakes, MN <br />Bid Date: <br />Item Description <br />Phase 1 <br />MobTrzation <br />Common Excavation <br />Topsoil Strip &Place <br />Mill Bit Surface <br />Grade Prep <br />Class 5 (4 ") <br />Bituminous Wear Course (21/2' <br />Concrete Curb & Gutter Design <br />Parking Lot Striping <br />Phase 2 <br />�- MoUrization <br />IlT9 Bit Surface <br />Grade Prep <br />Bituminous Wear Course (21/2') <br />Parking Lot Striping <br />Phase 3-aty Of Pequot Lakes <br />Mobilization <br />Mill Bit Surface <br />Grade Prep <br />Bituminous Wear Course (21/2 °) <br />Parking Lot Striping <br />Total Price far above Phase 1 Items: $61,915.85 <br />Total Price for above Phase 2 Items: $37,797.15 <br />Total Price for above Phase 3-aty Of Pequot Lakes items: $8,980.77 <br />Notes: <br />• Thank You for the opprotunity to quote this project <br />• if Phase 1, Phase 2 and the City portions are completed at the same time, there will be a Lump Sum Deduct of $4,800.00 total <br />• The quote reflects Phase 1 and the City portion being completed at the same time <br />• Placing salvaged topsoil in the proposed islands is included <br />• There is not a bond included in pricing <br />• Pricing for the proposed Phase 1 parking lot Includes; Striping and placing the eAtsing topsoil, Grading the area for drainage as designed to accept <br />4" of lass -5 and a 2 1/2" Bituminiaus wear course, Installing 86 -12 Concrete Cab and Gutter in the two island areas and Striping the lot only. Any <br />unfnrseen issues LE (old foundadans underground tanks, etc.) would be deft with seperatly <br />• Quote reflects removing and replacing the %tuminious from the back of curb along 2nd st. into the project <br />• Testing of the Bitumininus is included. Any other testing would be by the owner <br />6114/2Qio 4:48:56 PM Page 1 or 2 <br />