My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.03 Maintenance Facility Project Payment Certificate #4
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2018
>
08-07-2018 City Council Meeting
>
09.03 Maintenance Facility Project Payment Certificate #4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2018 3:41:19 PM
Creation date
8/3/2018 3:41:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AIA� Document G702'� -- 1992 <br /> Applicarion and Certificate for Payment <br /> TO OWNER: City of Pequot lakes PROJECT: Pequot Lakes Maintenance Garag APPUCATION NO: 4 Distributlon to: <br /> 4638 Main Street 4635 Derksen Road OWNER: <br /> Pequot Lakes,MN 56472 Pequote Lakes,MN 56472 PERIOD TO: 7/31/2018 ARCHITECT: <br /> FROM Boser Construction Inc. VIA CONTRACT FOR: General Construction CONTRACTOR: <br /> CONTRACTOR: 7135 5th Ave NE ARCHRECT: Wfdseth Smith Noiting CONTRACT DATE: FIELD: <br /> Sauk Rapids,MN 56379 7804 Industrial Park Rd PROIECT NO: 8638 <br /> Baxter,MN 56425 <br /> CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor eeNAes that to Ehe bast of the Conhactors Krrowtedge,IMarmatlon and <br /> Appliration is made for payment,as shown below,in cflnnection with the Conlract. beliei fhe Work covered by this App�ca8on for Pa�rtnent has been oortipleted in aaarorrdem:e wfth the <br /> AIA Document G703'"',ContlnuaUon Sheet,fs attached. Cantract Dowments,that au amamts have been paid by the Contrador tor Work ior wfllah previous <br /> 1.ORIGINAL CONTRACT SUM $ ��p� ��te�tar Payment were issued and paymems recelved form the Owrter,and that current <br /> ....._....__........__._..._....__...__.................._.._.............. peyment shawn herein is now due. <br /> 2.NET CHANGES IN THE WORK $ - <br /> .._......_._._.........._........_.__....._._._.........._.._.....__...._. <br /> 3.CONTRACT SUM TO DATE(LINE 1+Z) $ 894,000.00 CONTRACTOR: <br /> .._...__._.__.._.__....._._......._....___......w.....__.__..... <br /> 4.TOTAL COMPLETED AND STOREO TO DATE(Column G on G703) $ 421,782.70 By: Date: '?-Z3-rg <br /> 5.RETAINAGE ��������µ��µ����� State of: . �!� <br /> a 5%oi Completed Work(Column 0+E on G703) $ 21,089.14 County of:(�,�-• <br /> b. Oo�p of Stored Mate�(al(Cnlumn F an G703) g . Subscribed and sworn to before ��~�� <br /> �Nsta�lf�'� <br /> Tatal Retainage(Lrnes 5a+5b,orTotal in Cofumn 1 on G703) $ 21,089.14 me this 2"s , �• ���hn.31,�0 <br /> .__...........__.._._......._.._....._...._.___._.... <br /> 6.TOTAL EARNED LESS RETAINAQE S 4�,683.56 Notary Public: � G� <br /> ._..__..._........._......._......._........._._....__.._......�.._._._. . � <br /> (IJne 4 minus Line 5 TotaQ My Commi i�s"on e res: "2� <br /> 7..LESS PRENIOUS CERTIFICATE FOR PAYMENT $ 219,852.80 ARCHII'ECTS CERTIFICA PAYMENT <br /> .._....__.._.__.___.............�..._......._.�.... <br /> (line 6 from priarCertiBcate) In ae�ordar�ce wfth the Cantract Doa►mems,b�ed on on-site abserva8ona and Me deta camP►isin9 <br /> t.CURREWT PAYMENT DUE $ 180�840.76 this applfcaBon.me�tea��nne�ro�,e o�ner n,a�ro tne ne�a me�r�nf��rs�now��a�e, <br /> _.__.....„._........._........_................._...._...__......_....�.......................w.. infortnaUon and belief the Wrnk has progtessed as indipted,fhe qualfty of the Woric is in accordance <br /> 9.BALANCE TO FINISH,INCLUDING RETAINAGE wnh the Contract Documents,and the Conhactor is e�Hltled to peymeM oi the AMOUNT <br /> (Line 3 minus Line 6) $ 493,306,qq CERTIFIED. <br /> At�otnur CERrIFlEo..........................................„ 5 180,840.76 <br /> (Attach explana�on ff amount c�tifled cRfters irom tlre amount appped.Initlal atl rtgu�es on thla <br /> CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Applicadm and on tha Contfivatlon Sheet that are chmiged ro confarm�Itlt the amamt osrtlfled.) <br /> Tatal changes approved In previous months b Ovmer $ • $ - ARCHITECT•• /�' /�j , <br /> Total approved thEs month $ - $ - By: ��...�C.l'(�G+�v�--` oate: 07/26/2018 <br /> TOTALS $ - $ - Thls cer811cate�not nego b1n.The AMOUNT CERTIFIED is peyable onty M the Contractor <br /> named herein.lssuance,payment and acxeptance o(payment are wRhout prejudkae to any righis ot fhe <br /> Owner or Contrastor undar this Contracl <br /> NET CHANGES b Ch e Order $ - <br /> AIA Document G702"-199L Copyrisht O 1953,1963,1965,1971,1983 and 1992 by The Ameripn Institute of Archkects.Afl ri�hts reserved.WARNING:THIS AIA G Document is protected by U.S.Copyright law and <br /> International Treaties.Unauthorized reproduction of distribution of this AIA m Document.or any oortion of it,mav result in severe cfvll and criminal penalties,and will be orosecuted to the maximum extent possible <br /> under the law. <br />
The URL can be used to link to this page
Your browser does not support the video tag.