Laserfiche WebLink
I-.— <br />11. . <br />8. The proposed signage will be used to identify the Mid Minnesota Federal Credit <br />Union. There will not be any negative aesthetic impacts from the proposed <br />signage. <br />9. The proposed sign is appropriate within the Commercial Zone. The area is <br />heavily wooded and hilly, ensuring that the sign will not affect neighboring <br />properties. <br />10. The Comprehensive Plan does not specifically address this request. <br />11. The use of the signs in the proposed configuration is compatible with the existing <br />neighborhood. The surrounding properties are used for commercial purposes. <br />12. The proposed use will not impair values nor substantially diminish properties in <br />the immediate vicinity. <br />13. The proposed sign will not impede the normal and orderly development and <br />improvement of surrounding vacant properties <br />14. The proposed signage will not create a cost fo additional ,public facilities or <br />services. <br />y <br />15. The subject property is already established with a vehicular pproach to the <br />property. The proposed sign will be one -sided and will face the driveway entrance <br />at the north side of the property. <br />16. There is no need for additional parking with the request of a sign. <br />17. The requested signage will not create any odor, fumes, dust, noise or vibration. <br />18. The proposed use will not cause; any pollution to ground or surface waters. <br />All members voted "aye ". Motion carried . , <br />ADDITIONS OR DELETIONS TO <br />OPEN FORUM: <br />NEW BUSINESS: <br />a. SuprValu's NW Driveway Exit, Discussion <br />Mr. �Aoa�t Mated that the ,access to Olson Street was designed for slow traffic and there <br />is an area whew traffic is cutting across a berm making the traffic pattern dangerous. <br />Shrubs or a fetice could be placed to deter the traffic. It was recommended that Staff <br />send a note to SuperValu requesting them to block the berm area. <br />OLD BUISNESSES: <br />a. Building Code Enforcement, Tom Nelson — Fire Chief (continuation) <br />Staff will provide the requested information in January. <br />b. CSAH 11 Corridor Study (continuation) <br />Staff explained the engineering firm conducting the study understands the Planning <br />Commission will not have time to accurately study the proposed improvements to County <br />Road 11 west of the new highway and that they are just looking for something to include <br />in their study. <br />MINUTES <br />Pequot Lakes Planning Commission <br />December 15, 2011 <br />5 <br />