My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.0 Public Works Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2018
>
08-07-2018 City Council Meeting
>
09.0 Public Works Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2018 1:55:26 PM
Creation date
8/3/2018 1:55:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CZI�► Of <br /> Pequot <br /> Lakes— _ <br /> Water/Wastewater Report <br /> July 2018 <br /> Water Dep� <br /> Facilitv Performance for June 2018: <br /> Flow <br /> Average daily gallons pumped: 118,000 gallons <br /> Maximum daily gallons pumped: 168,000 gallons <br /> Minimum daily gallons pumped: 71,000 gallons <br /> Total monthly gallons pumped: 3,436,000 gallons <br /> Lab <br /> Average daily chlorine concentration: 0.20(mg/1) <br /> �Recommended chlorine concentration: 0.2 to 0.5 mg/1 <br /> Average daily fluoride concentration: 0.73 (mg/1) <br /> �Recommended fluoride concentration: 0.5 mg/1 to 0.9 mg/1 <br /> Wastewater Den� '� <br /> Facilitv Performance for June 2018: ' <br /> Flow <br /> Average Daily Flow: 59,367 gallons (Design—121,795 gaUday) <br /> Maximum Daily Flow: 72,135 gallons <br /> Minimum Daily Flow: 52,884 gallons <br /> Tota1 Monthly Flow: 1,780,998 gallons <br /> Operations Reuort <br /> 1) Water treatment facility inspections were completed daily. <br /> 2) Wastewater facility and lift station checks were done every Monday,Wednesday, and Friday. <br /> 3) Monthly lift station maintenance(check amps,clean floats,inspect wet well,etc)was completed � <br /> on 7/19. <br /> 4) Weekly water testing was completed. <br /> 5) Water meters were read on 7/23. ' <br /> � Monthly fluoride report was submitted to Minnesota Department of Health on 7/1. <br /> � Monthly Discharge Monitoring Report was submitted to MPCA on 7/1. ' <br /> 8) The City's new sewer jetter is being built and is set to be delivered in September. We will begin I <br /> our annual cleaning of the City's gravity sewer lines with the current jetter in August and finish <br /> up with the new machine in September. <br /> 9) The wastewater pond dikes were sprayed for weed control on 7/30 and 7/31. <br /> 10) Monitoring wells around the City's wastewater ponds were sampled on 7/10. <br /> 11) The City's spray irrigation system sustained some lightning damage from a storm in mid July. <br /> We aze still assessing the damage and should have it repaired soon. Luckily we are still able to <br /> irrigate in manual mode while repairs are made. <br /> 12) The City has received quotes from Central Tank Coatings and KLM Engineering for power <br /> washing and painting the City's 200,000 gallon elevated water storage tank. <br /> Respectfully Submitted By Andrew Schwartz,Manager,Pine River Area Sanitary District <br /> Please feel free to call my cell at 320-232-5787 with any questions/concerns <br /> For 24 hour emergency service call 218-851-9060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.