My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01A Maintenance Facility Project - Boser Construction Payment Certificate #3
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2018
>
07-09-2018 City Council Meeting
>
09.01A Maintenance Facility Project - Boser Construction Payment Certificate #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2018 12:23:47 PM
Creation date
7/5/2018 12:23:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AIA� Document G702� - 1992 <br /> Application and Certi�icate for Payment <br /> TO OWNER: City of Pequot Lakes PROJECT: Pequot Lakes Mafntenance 6arag• APPLICATION NO: 3 Distribution to: <br /> 4638 Main Street 4635 Derksen Road OWNER: <br /> Pequot lakes,MN 56472 Pequote Lakes,MN 56472 PERIOD TO: 6/30/2018 ARCHITECT: <br /> FROM Boser Consuuttion Inc. VIA CONTRACT FOR: Generel Construction CONTRACTOR: <br /> CONTRACTOR: 7135 Sth Ave NE ARCHITECT: Wtdseth Smith Nolting CONTRACT DATE: FIELD: <br /> Sauk Rapids,MN 56379 7804 Industrial Park Rd PROJECT NO: 8638 <br /> Baxter,MN 56425 <br /> CONTRACTOR'S APPLICATION FOR PAYMEM The underslgned Contrac�or certlAes that to the best ot the Ccntractor's WroxAedge,infom�adon and <br /> Appfit�tion is made for paymeM,as shown betow,in connection with the Conhact. ���0►��e�d�'�MpAptl°n tor Pay"'e"t has bee"completed in acao►dence wffh the <br /> AIA Document G703TM,Contlnuation Sheet,is attached. Contrect Dowments.that all mnol►nb heve b8en peld by dte Conhattot tor Work for which prevlou3 <br /> 1.ORIGINAL COMRACT SUM � �.�.� �emficates for Payment�rere issued and paymeMs received tam ths Owner,and tha!ament <br /> .�....._....w.._._.__.___..._......__.....�..�...�.._.....__.._... payment shawn heroln is now due. <br /> 2.NET CHANOES IN THE WORK $ - /C� <br /> ._..._.......__...._.............._M..._......�._................_._.........._. <br /> 3.CONTRACT SUM TO DATE(UNE 1+2) $ 894,000.00 CONTRACTOR: <br /> 4.TOTAL COMPLETED AND STORED TO DATE(Column G on G703) ����M�����w� � $ 231,424.00 By: Date: �o•o�.�./8 <br /> 5.RETAINAGE ��������w�� State of:� <br /> a. 5%o�Ccmpteted Work(Column 0+F�G703) $ 11,571.20 County of��-, �c� ��M� <br /> '�k1tpR <br /> b. Oo�°i St°red Material(Column F on G703) g _ Subscribed and sworn to befor r�; � <br /> ., �1►'ubik- <br /> Total Retainage(Lines 5a+56,o�Total in Column J on G703) $ 17,571.20 me this �� a� �� ��Ji►.3],�p <br /> _..�......._......_.._..__.._.........._._......_. - <br /> 8.TOTAL EARNED LESS RETAINAGE $ 219,852.80 Notary Publi � <br /> ....._.__....____....w..........._.__.._........W...._.._.._....._. Y . <br /> (Urte 4 minus Lfne 5 Totel� M Commi on es• <br /> 7..LESS PREVIOUS CERT(FICATE FOR PAYMENT $ 75,674.15 ARCHITECTS CERTIFICAT 0 AYMENT <br /> _..._..__.._............__...._........._.._............ <br /> (Une 6 from prior CertHlcateJ In accordance with ihe Contract Dacuments.baaed on on-stte observatlona artd the deia comprising <br /> 8.CURRENT PAYMENT DUE $ 144,178.65 ���p�0".�ei��°��ro fhe Oarner Ihai to the best oi the Architects knowledge, <br /> _____.._._._..._..___.�_.....__..___._._.__......�_�...__w___..__ mrormanon ana aener�e work nas proyre.ssea as mdlceted,me quaary of we wonc Is m accora�ce <br /> 9.BALANCE TO FlNISH,INCLUDINO ItETAINAGE y�i�h pre Contract pocumenb,and the CflnUactor is en�ed ro payment W the AMOUNT <br /> (Une 3 m(nus L.fne 6) $ 874,147.20 CERTIFlED. <br /> AMOUAfT CERTIFIED............................................ 8 - $144,178.65 <br /> (Atmch exptanatlon H amount certlHed dHfers han fhe anmwrt epplied.Irn8a1 all ftgures on this <br /> CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Appucaeon and an the CandnuaUon SAeet that are changed to confarm uuim fhe amaunt certiAed.} <br /> Total changes approved in previous manths by Owner $ - a - ARGHI� �n� <br /> Totat approved this month $ - $ - By: .,....� (.E� �_ Daro: 6/22/2018 <br /> 70TALS $ - a - fiis catlAcate ia rrot negoUabte.The AMOUNT CERTIFIED ts payabla only to the ConUactor <br /> narrted hereln.Isauartoe�PaYme�and aa:eptance of payment are wflhout prejudice to any dghfs of the <br /> NET CHANGES b Ch e Order $ _ Owner or Contracror u�er this Comred. <br /> AIA Dotument G702"'-199L Copyright�1953,19b3,1465,1971,1983 and 1992 by The Amerlan Instftute of Archftects.All rlahts reserved.WARNING:THIS AIA°Document is protected by U.S.Copyrlght Law and <br /> In[emational Treaties.Unauthorized reproduction of distribution of this AIA°Dotument,or any portion of It,may result in severe civil and crfminal penalties,and will be prosecuted to the maximum extent possfble <br /> underthelaw. <br />
The URL can be used to link to this page
Your browser does not support the video tag.