My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 Public Works Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2018
>
07-09-2018 City Council Meeting
>
09 Public Works Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2018 12:22:52 PM
Creation date
7/5/2018 12:22:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of <br /> Pequot <br /> Lakes = - <br /> Water/Wastewater Report <br /> June 2018 <br /> Water Dept. <br /> Facilitv Performance for Mav 2018: <br /> Flow <br /> Avera.ge daily gallons pumped: 113,000 gallons <br /> Maximum daily gallons pumped: 191,000 gallons <br /> Minimum daily gallons pumped: 67,000 gallons <br /> Tota1 monthly gallons pumped: 3,390,000 gallons <br /> Lab <br /> Average daily chlorine concentration: 0.20(mg/1) <br /> *Recommended cWorine concentration: 0.2 to 0.5 mg/1 <br /> Average daily fluoride concentration: 0.73 (mg/1) <br /> *Recommended fluoride concentration: 0.5 mg/1 to 0.9 mg/1 <br /> Wastewater Deut. <br /> Facilitv Performance for Mav 2018: <br /> Flow <br /> Average Daily Flow: 60,760 gallons (Design—121,795 gaUday) <br /> Maximum Daily Flow: 68,722 gallons <br /> Minimum Daily Flow: 52,335 gallons <br /> Total Monthly Flow: 1,883,573 gallons <br /> Ouerations Report <br /> 1) Water treatment facility inspections were completed daily. <br /> 2) Wastewater facility and lift station checks were done every Monday,Wednesday,and Friday. <br /> 3) Monthly lift station maintenance(check amps,clean floats,inspect wet well,etc)was completed <br /> on 6/20. <br /> 4) Weekly water testing was completed. <br /> 5) Water meters were read on 6/21. <br /> 6) Monthly fluoride report was submitted to Minnesota Department of Health on 6/5. <br /> 'n Monthly Discharge Monitoring Report was submitted to MPCA on 6/6. <br /> 8) The quarterly pond influent sample was taken on 6/12. <br /> 9) A new water/sewer utility service truck has been ordered. The truck will be purchased from a <br /> fleet service through NJPA and the utility body and crane will come from ABM Equipment <br /> through the MNDOT State Equipment Contract. <br /> 10) The wastewater pond dikes were sprayed for weed control on 6/13. <br /> 11) The City's spray irrigation system has been operating well and we have irrigated approximately <br /> 8.5 million gallons this year. <br /> Respectfully Submitted By Andrew Schwartz,Manager,Pine River Area Sanitary District <br /> Please feel free to call my cell at 320-232-5787 with any questions/concerns <br /> For 24 honr emergency service call 218-851-9060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.