|
Multimedia Sign Installation - 10' x 20', 20' above ground to underside
<br /> City of Pequot Lakes. Updated 4/25/18
<br /> Installation with one pole,20'above ground to underside
<br /> Single Sided Double
<br /> Initiai Costs Quote Company Low High Low High
<br /> 10'x 20'Sign Light King Outdoor 49,945 49,945 91,315 91,315
<br /> Structural Engineering Michaei C Brady&Assoc. 500 500 500 500
<br /> Sign Structure installation&Elec/hookup Scenic Sign(in pricing) 50,000 50,000 50,000 50,000
<br /> Bring 240V Electrical to Site (includes meter) MN Power 1,000 2,000 1,000 2,000
<br /> Bring Internet to Site(not req.-4G modem incl.) TDS Telecom 50M6 DSL TBD TBD TBD TBD
<br /> Annual Electrical Power Bill(25-50/month) MN Power 300 600 300 600
<br /> Annual Internet Bill (40-50/month) TDS Telecom or cell service 480 600 480 600
<br /> Graphic Designer(estimated-8-15 ads X$50 X 4/yrj TBD 1,600 1,600 3,000 3,000
<br /> Maintenance(1st year) Light King Outdoor(included) - - - -
<br /> Total Initial Costs 103,825 105,245 146,595 148,015
<br /> Ongoing Costs-Years 2-5
<br /> Salesperson or volunteer(25%of revenue if Clear Channel or similar) - 6,000 - 12,000
<br /> Graphic Designer TBD 1,600 1,600 3,000 3,000
<br /> Electrical Power Bill x 12 months MN Power 300 600 300 600
<br /> Internet Bill x 12 TDS Telecom or cell service 480 600 480 600
<br /> Maintenance(Annual,Years 2-5) TBD 1,000 1,000 1,000 1,000
<br /> Annual Costs 3,380 9,800 4,780 17,200
<br /> Ongoing Costs-Years 6-10
<br /> Salesperson or volunteer(25�0 of revenue if Clear Channel or similar) - 12,000 - 12,000
<br /> Graphic Designer TBD 1,600 1,600 3,000 3,000
<br /> Electrical Power x 12 MN Power 300 600 300 600
<br /> Internet Bill x 12 TDS Telecom or cell service 480 1,188 480 1,188
<br /> Maintenance(Annual,Years 6-10) TBD 1,SQ0 1,500 1,500 1,500
<br /> Annual Costs 2,380 15,388 3,780 16,788
<br />
|