My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.04A-B Maintenance Facility
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2018
>
06-05-2018 City Council Meeting
>
09.04A-B Maintenance Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2018 8:55:37 AM
Creation date
6/1/2018 8:55:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AIA� Document G702� - 1992 <br /> Applicarion and Certihcate for Payment <br /> TO OWNIER: City of Pequot Lakes PROJECT: Pequot lakes Maintenance Garag APPUCATION NO: 2 Distribution to: <br /> 4638 Main Street 4635 DerkSen Road OWNER: <br /> Pequot Lakes,MN 56472 Pequote lakes,MN 56472 PERIOD TO: 5/30/2018 ARCHITECT: <br /> FROM Boser Constructton Inc. VIA CONTitACT FOR: Generai Constructlon CONTRACTOR: <br /> CONTRACTOR: 7135 Sth Ave NE ARCMITECT: Widseth Smith Nolting CONTRACT OATE: FIELD: <br /> Sauk Raptds,MN 56379 7804 Industrial Park Rd PROIECT NO: 8638 <br /> Baxter,MN 56425 <br /> CONTRACTOR'S APPUCATION FOR PAYMIEM The underslgned Conaaetor cer6fres tl�at ro Ne best oi the Contract�s Knowleage,tnformaHon and <br /> App�cation is made tor payme►�,as shoum belaw,fi conrtection with the Cantract beitef the Wark cov�ed by fhb Applic�tlon for Payment has been completed in axordance wtth the <br /> AIA DoCumeM G703T�'.Cantir►uation Sheet is attached. Contract Doaments,that a0 amamb have been pald by the Contrector for Wwk Mr which prevtaus <br /> 1.ORlGINAL CONTRACT SUM $ 894.000.00 ���Payment w�e issued ar�d peyments rectived farm the Oumer.and that current <br /> ___._.._._.._..__.._._._.._..............._......_._..._._... payment ahawn heretn is rrow due. <br /> 2.NET CHANGES IN THE WORK $ - <br /> 3.CONTRACT SUM TO DATE(L1NE 1+2) '���'~W� �•�.������ $ 894,000.00 CONTRACTOR: <br /> 4.TOTAL COMPLETED AND STORED TO DATE(Column G on G703J � $ 79,857.00 By: Date: �al.�$ <br /> S.RETAINAGE ��� State of:� �k <br /> a. 5%o�Completed Worlc(Column D+E on G703) S 3,982.85 County of:��,.,. <br /> � �%of Srored Material(CoJumn F on G703) g _ Subscribed and swom to before <br /> w L. <br /> Total Retainage(Lirtes 5a+5b,or Tofal In Column!on GT03) $ 3,982.85 me th fs ZI� � ay o �� ,;. <br /> 8.TOTAL EARNED LE8S RETAINA(iE ���� � �y� S 75,674.15 Notary Public•� ,�,_� <br /> (Lrne 4 mirtus lbre 5 TWaQ _....._..._....._...__...._...._..�...._ ..._._..____ My Comm t s�i`6"n e x p� ��•�1/W611 W i l�H l tl�l �'.�•;. <br /> 7..LESS PREVIOUS CERTIFICATE FOR PAYMENT g 13,568.85 ARCHRECTS CERTIFlCATE FOR PAYMENT <br /> (Lir►e 8/rom prior Certificate) M......�......_._..�. In acoordance rdth the Cantrad Documenls.based on on-stte observetlons and tha dahd comDrisl►nJ <br /> a.CURRENT PAYMENT DUE 3 62,105.30 �'�appttcatlan,the Archttgci cer�es ro�e O►mer tl�et ro me bes�oi tlro archReas knawlsdge. <br /> 9.BALANCE TO FINISH,INCLUDU�IG RETAINAGE -�.����m����� �1f0R1�0"���wak has progressed as mmcated,are qual�y or the work is m a000rdance <br /> with fhe Contract Oocumenb.and the Caio�ectm Is entltled ro payment oi the AMOUNT <br /> (Line 3 minus Line 6) $ 818,325.85 CERTfFIED. <br /> Ad1WNT CERiIF1ED............................................ 5 - $62,105.30 <br /> (Mtach sxptana6�H e�rro�mt certlAed dffleB trom the amounl appded.Irtidat an figures on 9�Is <br /> CHANGE ORDER SUMMARY ADDITIONS DEDUCTIQNS AppAcetlon and on the Contlnuatlon Sheet that ere changed to cflniorm with the amount c�tlfled.) <br /> Total chartges a roved'm previous months by Owner $ - $ - ARCHITE� /�n <br /> Total approved this month $ - $ - er: A ��� Date: 5/24/2018 <br /> TOTALS a - S - Thfs cerfAAcate is not neg te.The AMOUNT CERTIFIED is peyable oniy to tha Contraclor <br /> named herehi.Issuence,peyment and acxeptartce oi payment ere without prejudice to any righffi of the <br /> NET CHANGES Ch e Order $ _ ���►��o��der this Canraa <br /> AIA Docurt�eM G702�"-199L Copyri6ht m 1953,19b3,1965,1971,1983 and 1942 by The Ameripn Instttute of ArchKects.All►fahts reserved.WARNING:THIS AIA`�Oacument is protected by U.S.Copyn�ht Law and <br /> International Treaties.Unauthorized reproduRion of distribution of this AIA°Oocument,or any portion of IL may result in severe civil and criminal penalties,and wdl be prosecuted to the maxfmum eutent possible <br /> underthelaw. <br />
The URL can be used to link to this page
Your browser does not support the video tag.