My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9 Approval of February 15, 2018 Minutes
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2018
>
03-15-2018 Planning Commission Meeting
>
9 Approval of February 15, 2018 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2018 12:56:55 PM
Creation date
3/8/2018 12:56:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Proposed"Lots i—5" contain adequate contiguous lawn area for the construction <br /> of two standard private sewer systems. "Outlot A"is to be 1/5+�ownership <br /> designated for Green Space. <br /> 6. Proposed"Lots i — 5"conform to the minimum requirements of the "Shoreline <br /> Residential"zone. <br /> �. Lot layouts are compatible with the existing layout of adjoining properties. The <br /> proposed layouts will not constrain the future development of adjacent <br /> properties. <br /> 8. The proposed side lot lines for each of the lots are at right angles to straight road <br /> lines or radial to lake shores. <br /> 9. Proposed"Lots 1— 5" have adequate frontage on Hurtig Road. "Outlot A"does <br /> not have frontage on public right-of-way but is designated for Green Space. <br /> 10.The proposed development does not contain any streets. <br /> 11. There are not any known or proposed easements for public utilities on the subject <br /> property. <br /> 12. Each of the lots will not require a Variance to allow their intended purposes. <br /> i3. The Minnesota DNR has been notified of this request. They have not raised any <br /> concerns. <br /> And subject to the following Conditions: <br /> i. Wetland area shall not be modified unless authorized by Crow Wing Soil <br /> and Water Conservation District. <br /> 2. "Outlot A"may only be used by owners of land in the development to access <br /> Mayo Lake. Each "unit owner" may be allowed to place one dock along the <br /> shoreline of"Outlot A." <br /> 3. An easement shall be created for the storm drain located between Lot�and <br /> Lot 2. The long-term maintenance of the drain shall be addressed in the <br /> Declaration and approved by the City. <br /> 4. Natural or manmade storage areas shall be utilized where needed and shall <br /> be designated by drainage and utility easement by the subdivider. All <br /> storage areas shall be vegetated and designed to lower naturally after a <br /> storm. <br /> 5. Onsite septic systems shall conform to Minnesota Pollution Control Agency <br /> Standards,Individual Sewage Treatment Systems Standard, (Chapter�080 <br /> af the Minnesota Administrative Rules) and the City of Pequot Lakes SSTS <br /> standards. <br /> 6. Onsite wells shall conform to the Minnesota Department of Health Rules <br /> and Regulations MHD 2�0-230 "Water Well Construction Code." <br /> �. The developer shall pay a park dedication fee (or dedicate land to the city <br /> valued at an equal amount)in the amount of$4,680.0o in accordance with <br /> Section i�-9.io"Dedication to the Public—Standards." ($4i6 X 2.25 PPH = <br /> $936 X 51ots = $4,680.) <br /> Planning Commission Member Mortenson asked who is responsible for putting the <br /> drainage culvert in. Mr. Burslie stated Land Use Permits won't be issued for Lots i and 2 <br /> until the culvert is installed. <br /> Minutes � <br /> Pequot Lakes Planning Commission <br /> February i5, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.