My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.03 Maintenance Facility Project Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2018
>
03-06-2018 City Council Meeting
>
09.03 Maintenance Facility Project Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2018 12:53:50 PM
Creation date
3/1/2018 12:53:50 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM #9.3 <br /> e��y of <br /> Pequot <br /> Lakes— _ <br /> REPORT TO CITY COUNCIL <br /> Report Prepared by: Tim I3oule <br /> Date: March 6, 2018 <br /> 5ubiect: Maintenance Facility Project Upda.te <br /> Report: The following is an update of the ta.sks and timeline for the <br /> Maintena.nce Facility Project. <br /> • We are awaiting bond and insurance information from Boser Construction. <br /> • The pre-construction meeting has been scheduled for March 21�. <br /> • From March to May (when road restrictions are removed), shop drawings, <br /> ordering of materials, and preparation will occur. <br /> • Per the contract, Project completion is no later than the end of September. <br /> Council Action Requested: No Council action requested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.