My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 Public Works Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2018
>
03-06-2018 City Council Meeting
>
09 Public Works Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2018 12:52:27 PM
Creation date
3/1/2018 12:52:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
eity of <br /> Pequot <br /> Lakes = -_ <br /> Water/Wastewater Report <br /> February 2018 <br /> Water Dept <br /> Facilitv Performance for Januarv 2018: <br /> Flow <br /> Average daily gallons pumped: 77,000 gallons <br /> Maximum daily gallons pumped: 98,000 gallons <br /> Minimum daily gallons pumped: 60,000 gallons <br /> Total monthly gallons pumped: 2,316,000 gallons <br /> Lab <br /> Average daily chlorine concentration:0.41 (mg/1) <br /> *Recommended chlorine concentration: 0.2 to 0.5 mg/1 <br /> Average daily fluoride concentration:0.74(mg/1) <br /> *Recommended fluoride concentration:0.5 mg/l to 0.9 mgJl <br /> Wastewater Dent <br /> Facilitv Performance for Januarv 2018: <br /> Flow <br /> Average Daily Flow: 56,652 gallons (Design—121,795 gaUday) <br /> Maacimum Daily Flow: 64,803 gallons <br /> Minimum Daily Flow: 47,348 gallons <br /> Total Monthly Flow: 1,756,215 gallons <br /> Operations Report <br /> 1) Water treatment facility inspections were completed daily. <br /> 2) Wastewater facility and lift station checks were done every Monday,Wednesday,and Friday. <br /> 3) Monthly lift station maintenance(check amps,clean floats,inspect wet well,etc)was completed on 2/28. <br /> 4) Weekly water testing was completed. <br /> 5) Water meters were read on 2/21. '', <br /> � Monthly fluoride report was submitted to Minnesota Department of Health on 2/5. ' <br /> 'n Monthly Discharge Monitoring Report was submitted to MPCA on 2/5. II <br /> 8) We are working with a couple companies specializing in plant control equipmendsoftware on getting ' <br /> quotes for our water treatment plant SCADA upgrade. <br /> 9) One of the raw sewage pumps at the Brown/Heath lift station was replaced by MN Pumpworks. The , <br /> Pumpex pumps in that starion have 17 years on them and we will probably look at replacing the other �, <br /> pump ne�ct year if it makes it that long. � <br /> 10) Several water lines in town froze during the last couple weeks of February. Hopefully the below zero i <br /> temps are coming to an end for this winter. <br /> 11) We dealt with some ice issues in the water tower several weeks ago. Luckily,we were able to catch the , <br /> problem before it got worse. After several days of flushing and adjusting tower start and stop set points <br /> everything was back to normal. <br /> Respectfully Submitted By Andrew Schwartz,Acting Manager,Pine River Area Sanitary District ' <br /> Please feel free to call my cell at 320-232-5787 with any questions/concerns <br /> For 24 hour emergency service ca11218-851-9060 <br /> I� <br /> I <br /> � <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.