Laserfiche WebLink
Tuesday,December 26,2017 <br /> Office Earnings 9:12:34AM <br /> Widseth Smith Nolting 8 Assoc.,Inc. For the period 12/1/2017-12/31/2017 <br /> Budget Status Report - Pequot Lakes - SE Quadrant Storm Drainage Study <br /> Job-to-Date Contract Total Job-to-Date Spent Total _ Job-to-Date Total Billed <br /> 00 <br /> 9,000 �oo <br /> �• <br /> This is the storm drainage study for the SE quadrant of Downtown. <br /> 8,500 � <br /> �.' <br /> ' We are definitely under budget, although we need to package up <br /> s,000 the figures, cost estimate, etc. into a final report. <br /> '�"' � With the recent authorization on a Rasmussen Road Study <br /> ��. � <br /> � � � <br /> # <br /> �, �,500 (including the Old Hwy 371 segment), we do have some room in <br /> o this project's budget to adjust if necessary. <br /> � �,000 `�t � � <br /> ��;- �� �:'. <br /> .��r aa : ,+ .,.,��',,, <br /> 6,500 <br /> 6,000 <br /> ,�6 ,�'�o <br /> h�^� y��� <br /> 5,500 <br /> SE Quadrant Storm-Drainage Study <br /> Project Name <br /> Show Contract Contract Contract Contract Spent Spent Spent Spent Total Total Spent <br /> Unposte Labor Consultant Expenses Total Labor Consultant Expenses Total Billed Received Hours <br /> d <br /> Project Number:0730B0062.000 SE Quadrant Storm-Drainage Study <br /> JTD 8,900.00 8,900.00 5,489.00 48.16 5,537.16 5,537.16 5,537.16 52.00 <br /> v7.6.717(0078)- Billing,Project Budgeting,Show Unposted Page 1 of 1 <br />