Laserfiche WebLink
Page 2 of 4� MPC Progr�.�Y 2017-2022 � <br /> I�ace:04/20/2017 <br /> Ezhibit A-Table of Tech Serv <br /> Used with TA98 Project IDs <br /> If a source code is not on this list,a work order is needed. <br /> '�: "?`.�:,�.. � _ - <br /> 1732 Material Testing&Inspection Performing construction phase and research physical and chemical laboratory testing,and related technical services in the districts <br /> and central labs,and for performing research and construction phase non-destructive testing materials surveys,and related technical <br /> ; services in the field and offices.Includes detour surveys.Non-destructive tests include,skid resistance and falling weight <br /> I___ _ _____ deflectometer(FWD)testing. <br /> I 1733 Concrete Plant Inspecrions Performing QA/QC physical testing at the plant;sampling and transporting of materials from the plant to the lab for lab tasting,plant <br /> reviews,and operations;invesrigating plant discrepancies;and other technical sarvices in the plant or office associated with <br /> ! stationary concrete lants or mobile concrete avin lant ins ection. <br /> �1734 Construction Materials Inspections Performing construction phase material inspection and engineering,for structural steel,precast and pre-stressed concrete, <br /> � reinforcement steel,and electrical products and related technical services in the field and office for materials to be used in multiple <br /> � projects.Includes travel time,sampling,and sample delivery.Includes tasks related to reviewing shop drawings furnished by <br /> suppliers or fabricators and contractor working drawings or calculations,and for tasks related to structural metals inspection <br /> (materials surveys,physical and chemical laboratory testing,material inspection and engineering,and technical services in the field <br /> _ and offices). <br /> 1735 Bituminous Plant Inspection Performing QA/QC physical tesring at the plant;sampling and transporting of materials from the plant to the lab for lab testing,plant <br /> reviews,and operations;investigating plant diecrepancies;and other technical services in the plant or office associated with <br /> bituminous lant ins ection. <br /> 1738 State Project-Specific Materials Pert'orming material inspection for materials designated for a specific construction project(SP).Generally applies to inspection of <br /> � Inspection such things as stntctural steel,prestressed concrete items,and most precast concrete items and for SP specific tasks related to <br /> structural metals inspection(materials surveys,physical and chemical laboratory testing,material inspection and engineering and <br /> technical services in the field and offices). <br /> �1800 Field Inspection Occasional construction project field inspection(not cyclical inspection of assets);Includes field inspection of materials such as <br /> igradations,densities/DCP,proctors,compaction,slump tests,attd field air testsand collecting and lransporting samples for lab tests, <br /> _ but not the actual laborator�verifications. <br /> 1870 Traffic Signal Maintenance Th�s work will not subst�tute for or alter ex�stmg cooperative construction agreements or traffic signal maintenance agreements. <br /> i Work related to the occasional repair and replacement of traffic signal system structures and all electrical maintenance for traffic <br /> signal systems including electrical power,labor,equipment materials,GSOC locates,traffic control and responses to public <br /> ______ _ in uiries. <br /> 1871 Lighting Maintenance&UtilitiesT All work related to installing,maintaining,restoring,or removing highway lighting systems and fixtures.Includes repairing, ' <br /> maintaining,or replacing supporta necessary For roadway lighting luminaries.Includas patrol highway lighting,inspect lighting <br /> structures,elec2rical service for highway lighting,re-lamping,pump stations,anti-icing systems,truck roll-over warning systems and <br /> electrical repairs.Ittcludes traffic control in aupport of roadway lighting activities,Use for tasks related to public <br /> inquiries/complaints,review utility billings,provide data,and conduct field reviews. <br /> 1875 Locate One Call Finding and marking locations of buried conduit,cables,hand holes,loops,etc.in order to maintain or repair the traffic management <br /> i �__.� _._____._______,_^___ __ _ system,s�al systems,or roadwa li tin�systems. <br /> If a source code is not on this list,a work order is needed. <br /> C:\Users�mcgiltay�AppData�I..ocalWiicrosoft\Windows\Temporary Internet Files\Content.0utlook\11GPM1KX�Exhibit A-Table of Technical Services 04-20-2017 SJB.xlsx <br />