Laserfiche WebLink
PROJECT ROUGH ORDER OF MAGNITUDE <br /> This is ROM pricing is designed to give you an idea of the cost range you are likely to find for a <br /> project of this nature. This is not a final quote and all pricing in this document is subject to <br /> change as project parameters are more clearly delineated. <br /> This Initia) Proposal is based on NYBY 2016 / IBC 2015 and the foilowing load criteria: <br /> • Wind: 115mph <br /> • Wind Exposure: C <br /> � Snow: 50psf <br /> • Enclosure: Enclosed <br /> • Exposure: Fully <br /> • Occupancy: Standard Hazard <br /> The design criteria used is accurate to the best of our knowledge. All criteria will be verified by <br /> the local building official prior to final design and issuance of sealed drawings or construction. <br /> As proposed below exterior 19oz PVC fabric carries a 15-year pro-rated warranty. <br /> As proposed below HDG Steel Frames carry a 15-year pro-rated warranty. <br /> FOUNDATION AND FRAME <br /> • 50' w x 60' I (3,000 ft2) Legacy Building Solutions structure <br /> • Hot dipped galvanized frames: 20'o.c. <br /> • 16' Interior sidewall clearance <br /> • 28' Interior peak clearance <br /> • Designed for a 2'high concrete pier- Foundations/anchors Supplied by Others <br /> FABRIC SPECIFICATIONS <br /> • Exxotec 19oz fire retardant PVC fabric <br /> • Fabric roof and side wall fabric combined <br /> � Fabric double-layered and laced to steei-contacting frames <br /> • (1) - 50'w Fabric end wall at top of foundation <br /> • (2} - 60'I Fabric side walls at top of foundatior <br /> � V�/ali fabric is direct-bolt terminated to exterior of steel frames: ratchets/straps removed <br /> after install. No re-tensioning maintenance required. <br /> LEGACYBIIILDINGSOLIITIONS.COM 4 <br />