Laserfiche WebLink
cZ�y of <br /> AGENDA ITEM #9.4 <br /> Pe uot <br /> q <br /> Lakes = -- <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Tim Houle <br /> Date: November 7, 2017 <br /> Subiect: Maintenance Facility Project <br /> Report: The Council authorized advertising for bids at <br /> the October 3rd City Council meeting. We are still checking <br /> around with various firms that perform this type of <br /> construction with the desire of trying to find any `sweet <br /> spot' for obtaining competitive bids. We are looking at <br /> dates around the end of this year into the beginning of next <br /> year so the City can award the contract in the spring and get <br /> a construction contractor going after spring thaw. <br /> The bidding documents (plans and specifications), besides <br /> the actual maintenance building (including office) and site <br /> improvements, will include a pad for a salt storage fabric <br /> arch structure. The City was going to procure the <br /> furnishing and installing of the salt storage fabric arch <br /> structure from a separate vendor/contractor. The City <br /> obtained one quote for this structure and it is higher than <br />