My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01 Trailside Park Phase 1 Service Proposals
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2017
>
10-03-2017 City Council Meeting
>
09.01 Trailside Park Phase 1 Service Proposals
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 12:24:03 PM
Creation date
9/29/2017 12:24:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ASSOCIATES <br /> ' 219 West First Street,Suite 350 Duluth MN 55802 I phone 218.391.I 335 I fax 218.722.6697 I email mail@saslandarch.com <br /> DATE: September 26,2017 <br /> TO: Nancy Malecha <br /> City of Pequot Lakes— <br /> 4638 County Road 11 <br /> Pequot Lakes,MN 56472 <br /> (e)nmalecha@pequotlakes-mn.gov <br /> FROM: Luke Sydow <br /> SAS+Associates <br /> RE: Phase I Cortstruction Plans for the Trailside Park Highwav 371 Vacation Project <br /> Nancy, <br /> We appreciate the opportunity to conrinue to work with you on this project. This project will continue to be an integral <br /> community element and SAS+Associates,Inc.(SAS)is happy to submit a proposal for the work. We could start working on this <br /> project immediately. Please call with any questions regazding this proposal. Our proposal is as follows: <br /> We are prepated to complete the Phase I Construction Plans for the Trailside Park Highway 371 Yacation Project as discussed. <br /> Construction Documentation,Bidding, Construction Observation,Phase <br /> Approach: <br /> SAS+Associates will complete Phase I Construction Plans and Details for submittal to WSN Engineers for inclusion in the final <br /> streets engineering package. Having WSN incorporate the pazk plans into adjacent street improvement project will allow for an <br /> integrated bid set reducing the overall cost to the City. SAS will engage Studio North Architecture as a subconsultant for the <br /> wanning house structure and the shade structure.Phase I elements include:flag display; concrete,asphalt and specialty walks; <br /> pedestrian crossings;veteran memorial relocation/enhancement;lighting;signage;parking;splash park;warming house and <br /> shade structure;pond(or substitute);and associated site elements such as fencing,railings and wayfmding. <br /> We are comfortable that the proposed fee and outlined tasks will be very close to the final numbers and required tasks. <br /> For granting purposes,SAS will track the Flag Display/Splash Park elements separately to allow for clear documentation. <br /> The plans produced during Design Development will be finalized during this phase of work.A small modification of the <br /> Approved Plan will be completed to redesign the area around the playground and to determine if a pond is still desired is included <br /> in the associated fees. T'his task includes: <br /> ■ Final Site Plans,Specifications and Details. <br /> ■ Architectural Plans,Specifications and Details <br /> ■ Coordination of Final Grading/Drainage Plans,Specifications and Details. <br /> ■ Final Landscape Plans,Specifications and Details. <br /> ■ Final Irrigarion Perfortnance Specifications(if required). <br /> ■ Final Lighting Performance Specificarions <br /> l <br /> Landscape <br /> Architecture <br /> Site+Urban Design <br />
The URL can be used to link to this page
Your browser does not support the video tag.