My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.06 Maintenance Facility Project
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2017
>
09-05-2017 City Council Meeting
>
09.06 Maintenance Facility Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2017 10:35:31 AM
Creation date
9/1/2017 10:35:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c�ty of <br /> AGENDA ITEM #9.6 <br /> Pequot <br /> La�es — . <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Tim Houle <br /> Date: September 5, 2017 <br /> Subiect: Maintenance Facility Project <br /> Report: The bidding documents (plans and specifications) <br /> for this building are 99% complete and basically awaiting <br /> advertising and bidding. We would recommend waiting <br /> until late this year / early next year to advertise (to <br /> hopefully obtain the most competitive bids). The City was <br /> going to procure the furnishing and installing of the salt <br /> storage fabric arch structure which we need to indicate to <br /> the building contractor to coordinate with. <br /> Council Action Requested: No Council action requested <br /> at this time, but we anticipate needing action in the next <br /> couple of months. <br />
The URL can be used to link to this page
Your browser does not support the video tag.