My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06.01 Planning Commission Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2017
>
09-05-2017 City Council Meeting
>
06.01 Planning Commission Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2017 10:24:57 AM
Creation date
9/1/2017 10:24:56 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> OLD BUSINESS: �� <br /> a.Trailblazing Signs I <br /> Mr. Burslie e�cplained the Staff Report. The draft Policy was discussed and revised as , <br /> follows: <br /> � <br /> Trailblazing Signs: ' <br /> • Use business name and directional arrow rath�r than distance; <br /> • Four signs per assembly; II <br /> Specific Trailblazing Signs: <br /> • These signs will be allowed for any business along Patriot Avenue not readily � <br /> visible from Patriot Avenue; I <br /> • There shall be two locations; one location shall direct traffic to Rasmussen Road <br /> near the Business Park; <br /> • There shall be four signs per assembly; <br /> Installation: <br /> Priority: <br /> • Add: A business may apply for one northbound Trailblazing Sign and one <br /> southbound�railblazing Sign; <br /> • Remove 2 (d); <br /> Sign Panel Design: <br /> • Each sign panel shall include the business name and a directional arrow; <br /> Location: <br /> • 4 (c) and 4(d) shall be determined after completion of road construction; <br /> • There shall be no Trailblazing Signs nor Specific Trailblazing Signs allowed in the <br /> Downtown Mixed Use Area; <br /> Sign Criteria: <br /> • All bttsinesses and service organizations located within the City of Pequot Lakes <br /> shall be allowed to apply for a Trailblazing Sign <br /> APPROVAL OF MINUTES: <br /> A motion was made by Planning Commission Member Mortenson, <br /> seconded by Planning Commission Member Habein,to approve the July 20, <br /> 2oi�Minutes. All members voted"aye". Motion carried. <br /> MINUTES 4 <br /> Pequot Lakes Planning Commission <br /> August i�,2oi� <br />
The URL can be used to link to this page
Your browser does not support the video tag.