My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.03 - County Road 11 Corridor Study
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2011
>
11-01-2011 Council Meeting
>
10.03 - County Road 11 Corridor Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2014 9:36:40 AM
Creation date
3/24/2014 9:33:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
County - December 2003. <br />7. Mn /DOT Bypass Layout (CAD) —with and without interchange <br />vi. Others? <br />No other plans or studies were identified that the project team should utilize as <br />a reference material. <br />4. Next Steps <br />a. Land Use Analysis / Future Traffic Generators <br />b. Traffic Analysis/ Forecasts <br />c. Corridor Vision <br />S. Next Meeting Dates <br />a. Thursday, October 27`h, 2011 -1:00 PM at Breezy Point City Hall <br />b. Thursday, December 1", 2011 -1:00 PM at Pequot Lakes City Hall <br />c. Thursday, February 2 "d, 2012 —1:00 PM at Breezy Point City Hall <br />The meeting dates listed above were thrown out as suggested meeting times and <br />locations. The Task Force group was asked that they get back to the study team if these <br />times would not work within a week. <br />H: \CWCO \T42103934 \meetings \Task Force \Task Force Meeting 1 \Task Force 1 Minutes (9- 29- 11).docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.