My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 Special Meeting with City Council - State Building Code
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2017
>
07-20-2017 Planning Commission Meeting
>
3 Special Meeting with City Council - State Building Code
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2017 10:56:57 AM
Creation date
7/14/2017 10:56:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/14/2016 <br /> Plumbing permits are not required for the clearing of plumbing stoppages,provided the work does not <br /> involve or require the replacement or rearrangement of valves, pipes, or fixtures. <br /> Should equipment replacement or repairs need to be performed in an urgent situation,a permit <br /> application can be submitted to the building official the next business day. <br /> Application for a permit is not required for ordinary repairs to a structure. The repairs shall not <br /> however, include the cutting away of any wall, partition, or portion of a wall or partition,the removal <br /> or cutting of any structural beam or load bearing support, or the removal or change of any required <br /> means of egress, or rearrangement of parts of a structure affecting the egress requirements;nor shall <br /> ordinary repairs include addition to,alteration of,replacement, or relocation of any standpipe,water <br /> supply, sewer, drainage, drain leader, gas, soil,waste, vent or similar piping, electric wiring, or <br /> mechanical or other work affecting public health or general safety. <br /> PLAN REVIEW <br /> On the surface, many believe that code enforcement is simply going to a construction site and <br /> inspecting construction activity in progress. If building code violations are found, orders are written <br /> and corrective action required. Simple as it sounds,this kind of code enforcement alone would <br /> actually add cost to most projects and serve the public interest poorly. In contrast,the idea of"plan <br /> review"is characterized by the building official's ability to address code issues ahead of time,thereby <br /> providing a cost savings to the owner through a more effective construction schedule and the cost <br /> savings that might otherwise be used by making required on-site corrections after the fact. Plan review <br /> can also serve to promote a positive and more open form of communication between the building <br /> official and their customers. <br /> Plan review takes time. It can range anywhere from a few minutes to an hour or two on most of the <br /> smaller residential types of projects. It can however, also take upwards of 20 to 40 hours per project <br /> on those larger commercial, industrial, or institutional types of projects. There may also be added time <br /> resulting from required changes or correspondence exchanges between the building official and a <br /> designer or building owner. In terms of the complexity of a project,the building official may even opt <br /> to contract out a portion or even all of the plan review to a third party. For some types of projects, <br /> construction plan review may need to be handled by a state or federal agency beforehand too. <br /> Examples of this may include public school district projects in excess of$100,000, hospitals or nursing <br /> home projects, and other state owned or state licensed facility projects. In some cases, state and/or <br /> federal laws may mandate other governmental agency review in addition to any local government <br /> review procedure. An example of this would be those commercial and/or multi-family dwelling <br /> projects where the plumbing plans must be reviewed and approved by the Minnesota CCLD— <br /> Plumbing Code Unit before a plumbing permit can be issued. Because of the time and complexities <br /> involved with plan review, a municipality may elect to collect plan review fees in addition to the actual <br /> building permit fee. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.