My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.01 - Government Drive Funding
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2011
>
10-04-2011 Council Meeting
>
10.01 - Government Drive Funding
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2014 11:43:06 AM
Creation date
3/20/2014 11:37:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L <br />Springsted Incorporated <br />380 Jackson Street, Suite 300 <br />S p r t n 9 S t e d Saint Paul, MN 55101 -2887 <br />Tel: 651 - 223 -3000 <br />Fax: 651 - 223 -3002 <br />www.sphngsted.com <br />MEMORANDUM <br />DATE: September 16, 2011 <br />TO: Pequot Lakes City Council <br />FROM: Paul Steinman, Vice President/Client Representative <br />SUBJECT: Financing Options for Government Drive — FOLLOW UP FROM 8 -30 -11 <br />As a result of the Council worksession on 8- 30 -11, we were asked to provide a follow up memo related to two <br />specific items: <br />1) Include additional street project cost estimates in the financing analysis <br />2) Modify the tax impact worksheet to recognize both the General and Rural rates <br />The following additional street project costs were added to the analysis: <br />$ 120,000 Old 371 (North half) 2,450' curb —gutter —sidewalks 30' wide <br />$ 25,000 East Grove Street 785' shape — gravel — pave 20' wide <br />$ 60,000 East Woodman Street Pave — 24' wide? curb — gutter on North side? <br />$ 17,000 Buschmann Alley 530' gravel — pave 14' wide <br />$ 4,000 North Brunes Street gravel — pave <br />$ 35,000 Derksen Road (West half) 900' gravel — pave to 10 ton <br />10,000 Noren Alley 625' gravel —pave 10' wide <br />$ 271,000 <br />$ 65,000 Akerson Road (West 1 mile) overlay <br />$ 40,000 Pequot Boulevard (West Lake Street to Ramsey Street) re -shape — remove — replace curb <br />18,000 Rae Ave 1,510' overlay 22' wide <br />$ 123,000 <br />$ 800,000 Washington Ave Storm sewer — curb — sidewalks — complete rebuild <br />120,000 County Road 112 curb — gutter — sidewalks (still in CWC control) <br />$ 920,000 <br />$ 70,000 South Hurtig Road gravel -pave 4,200' 22' wide <br />$ 60,000 South Sluetter Road gravel — pave 2,730'X 22'/2 Loon Lake last 670 all city <br />$ 100,000 North Sluetter Road 5,075' gravel —pave — 22' wide <br />$ 90,000 Myers Road 4,980' gravel —pave — 22' wide — (joint with Loon Lake) <br />20,000 Myers Road 1,200' gravel — pave 22' wide (joint with Jenkins) <br />$ 340,000 <br />Public Sector Advisors <br />
The URL can be used to link to this page
Your browser does not support the video tag.