My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.01 Fiber Optics Construction
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2017
>
06-06-2017 City Council Meeting
>
10.01 Fiber Optics Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2017 12:56:00 PM
Creation date
6/2/2017 12:55:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pequot Lakes Industrial Park and New Technology Park <br /> The following is for the construction of fiber optics to serve both the current Pequot Lakes Industrial <br /> Park and the proposed new Technology Park addition. It is important to note that this cost includes <br /> fiber to Derksen Rd,to be utilized for future expansion into the proposed New Technology Park that <br /> currently has two parcels and is located directly south of the current Industrial Park. <br /> All costs are based on estimates and a final cost will be determined when a final engineering package is <br /> kicked off. The final engineered plan can be+20%or-20%of the initial high level estimate. <br /> Based on a TDS predetermined contribution the cost to the EDC, in the form of an ATC(Aid to <br /> Construction),would be$86,000. <br /> If the EDC would like to proceed with final cost, an engineering project will be started, providing final <br /> network planning and a final firm cost for the project. The above ACT is based on a high level estimate <br /> only at this time. <br /> Aid to Construction—Process for Fiber/GPON Extensions <br /> 1. TDS provides a high level estimate for the ATC(Aid to Construction)customer contribution <br /> 2. If customer is interested in proceeding with the project a formal engineering project is started <br /> and final costs determine and then provided to the customer. The final project cost can be+or- <br /> 20%of the high level estimate. <br /> 3. Final ATC cost shared with the customer, if a customer wishes to proceed with the propose <br /> project,an ATC contract is executed. <br /> 4. Upon return of the signed ATC agreement,with payment,the construction project is then <br /> started. <br /> Current Products offered via Fiber Optic Facilities <br /> DFA—Dedicated Fiber Access <br /> • Products are delivered over a dedicated fiber facility,from the local TDS office to the customer <br /> premise (a secure last-mile connection). These services are carrier grade solutions for <br /> Commercial applications. <br /> • DFA products have advanced technical support and repair priority. <br /> • DFA products include <br /> o DIA—Dedicated Internet Access <br /> o MetroE—Ethernet Service(s) <br /> o managediP Suite <br />
The URL can be used to link to this page
Your browser does not support the video tag.