Laserfiche WebLink
EXTRACTED FROM 1994 UNIFORM BUILDING CODE <br /> *This is a"valuation" based permit schedule* <br /> TOTAL VALUATION FEE <br /> $1.00 to $500.00 $21.00 <br /> $501.00 to $2,000.00 $21.00 for the first$500.00 plus $2.75 for each additional <br /> $100.00, or fraction thereof,to and including $2,000.00 <br /> $2,001.00 to $25,000.00 $62.25 for the first $2,000.00 plus $12.50 for each <br /> additional $1,000.00, or fraction thereof, to and including <br /> $25,000.00 <br /> $25,001.00 to $50,000.00 <br /> $349.75 for the first$25,000.00 plus $9.00 for each <br /> additional $1,000.00, or fraction thereof,to and including <br /> $50,001.00 to $100,000.00 $50,000.00 <br /> $574.75 for the first$50,000.00 plus $6.25 for each <br /> $100,001.00 to additional $1,000.00, or fraction thereof, to and including <br /> $500,000.00 $100,000.00 <br /> $887.25 for the first$100,000.00 plus $5.00 for each <br /> $500,001.00 to additional $1,000.00, or fraction thereof,to and including <br /> $1,000,000.00 $500,000.00 <br /> $1,000,001.00 and up $2,887.25 for the first$500,000.00 plus $4.25 for each <br /> additional $1,000.00, or fraction thereof, to and including <br /> $1,000,000.00 <br /> $5,012.25 for the first$1,000,000.00 plus $2.75 for each <br /> additional $1,000.00, or fraction thereof <br /> Other Inspections and Fees: <br /> 1. Inspections outside of normal business hours $42.00 per hour * <br /> 2. Reinspection fees assessed under provisions of <br /> Section 108.8 $42.00 per hour * <br /> 3. Inspections for which no fee is specifically indicated $42.00 per hour* <br /> (minimum charge—one-half hour) <br /> 4. Additional plan review required by changes, additions <br /> or revisions to plans $42.00 per hour * <br /> 5. For use of outside consultants for plan checking <br /> and inspections, or both Actual costs ** <br /> • Or the total hourly cost to the jurisdiction,whichever is the greatest. This cost <br /> shall include supervision, overhead, equipment, hourly wages and fringe benefits <br /> of the employees involved. <br /> • <br /> ** Actual costs include administrative and overhead costs. <br /> GI025.doc <br />