My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.03 Street Quadrant Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2017
>
04-04-2017 City Council Meeting
>
09.03 Street Quadrant Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 8:48:06 AM
Creation date
3/30/2017 8:48:05 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• South Washington Avenue — street lighting, curbs, <br /> gutters, sanitary sewer, stormwater, and street <br /> improvements = $540,000 <br /> • Government Drive (East Butler Street to East <br /> Woodman Street) — sidewalks, curbs, gutters, <br /> stormwater, and street improvements = $252,000 <br /> • Main Street (Government Drive to existing Highway <br /> 371) — sidewalk improvements = $14,000 <br /> • Total street quadrant construction improvements with <br /> design engineering, construction phase services, and <br /> contingencies = $2,383,000 <br /> • NOTE: The above costs do not include land <br /> acquisition, should it be needed for right-of-way or <br /> storm drainage. <br /> Please remember that these are rough cost estimates that <br /> should be considered as the Council prioritizes projects. <br /> Council Action Requested: Council discussion on the <br /> street quadrant improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.