Laserfiche WebLink
• South Washington Avenue — street lighting, curbs, <br /> gutters, sanitary sewer, stormwater, and street <br /> improvements = $540,000 <br /> • Government Drive (East Butler Street to East <br /> Woodman Street) — sidewalks, curbs, gutters, <br /> stormwater, and street improvements = $252,000 <br /> • Main Street (Government Drive to existing Highway <br /> 371) — sidewalk improvements = $14,000 <br /> • Total street quadrant construction improvements with <br /> design engineering, construction phase services, and <br /> contingencies = $2,383,000 <br /> • NOTE: The above costs do not include land <br /> acquisition, should it be needed for right-of-way or <br /> storm drainage. <br /> Please remember that these are rough cost estimates that <br /> should be considered as the Council prioritizes projects. <br /> Council Action Requested: Council discussion on the <br /> street quadrant improvements. <br />