Laserfiche WebLink
City of <br />�- <br />Pequott <br />Lakes— <br />AGENDA ITEM #10.2 <br />REPORT TO <br />CITY COUNCIL <br />Date: August 2, 2011 <br />Subiect: RFP Highway 11 Corridor Study <br />Report: Tim Bray has released the attached RFP Highway <br />11 Corridor Study. Tim has indicated that there will be no <br />monetary participation requirement from the City for the <br />RFP. This will involve a high level planning effort with the <br />County, School District and the Cities of Breezy Point and <br />Pequot Lakes which will be led by the Consultant to be <br />hired by the County. <br />Per Tim Houle: I believe I have mentioned this <br />previously, but WSN, in a team effort with SRF, submitted <br />a proposal to the County with a different engineer in our <br />office (Dave Reese) being the WSN team member with the <br />County. We see our knowledge of the area and of the City <br />as a benefit in a County study such as this. The Council <br />should note that this Corridor Study process will involve <br />periodic meetings between City representatives and the <br />County team. I can envision the City using several of their <br />�" staff members as the primary representatives at meetings <br />