Laserfiche WebLink
City of <br /> Pequot AGENDA ITEM #9.7 <br /> Lakes= <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Tim Houle <br /> Date: January 3, 2017 <br /> Subject: Maintenance Facility Feasibility Study Update <br /> Report: I want to provide an update on the Maintenance <br /> Facility Feasibility Study we performed for the City. This <br /> Study looked at expanding the present City Hall building or <br /> building a separate facility for the Public Works <br /> Department. It was intended to be a high level study, <br /> touching only enough on specifics to determine major cost <br /> issues with further details to be worked out in a subsequent <br /> schematic and final design phase. <br /> After preparing a draft Study, we spent several months <br /> discussing Council comments and concerns — after which <br /> there was consensus by the Council to take next steps for a <br /> separate Public Works facility. We are presently <br /> incorporating over 12 comments from the Council into a <br /> final Study report document, to be used as background and <br />