My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 - Planning and Zoning Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2011
>
07-05-2011 Council Meeting
>
06 - Planning and Zoning Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2014 9:50:23 AM
Creation date
3/19/2014 9:49:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES <br />PEQUOT LAKES PLANNING COMMISSION <br />REGULAR MONTHLY MEETING <br />JUNE 16, 2011 <br />PRESENT: Tom Adams, John Derksen, Bill Habein, Mark Hallan and Scott Pederson. <br />ABSENT: Deb Brown and Cheri Seils. <br />CITY PLANNER: Charles L. Marohn, Jr., PE, AICP <br />ZONING ADMINISTRATOR: Dawn Bittner <br />COUNCIL LIAISON: Nancy Adams. <br />The meeting was called to order by Chairman Pederson. <br />DOWNTOWN MASTER PLAN DISCUSSION: <br />It was the consensus of the Planning Commission that the intent of the rewrite is good. It <br />was suggested that there should be a new name. Suggestions included Central Mixed <br />Use Zone, Center City Plan, Pequot Lakes Center City Plan, Historic Core Growth Plan, <br />and Grow Zone Expansion Plan. <br />Downtown means different areas to different people. The west side should be included <br />but how far south should it go, the new grocery store. Maybe the original Pequot plat, the <br />historic neighborhoods. The entire grow zone area was also suggested. Another <br />suggestion was everywhere that infrastructure is located, supporting where infrastructure <br />already is. <br />The new plan could have sub -plans: Government Drive; Park Plan; Industrial Park; City <br />Plan; County Road 11 Plan; Housing. <br />Ways to implement changes in this area could include: <br />1. Change street standards in the downtown areas; <br />2. Look at walkability of downtown and stress ability to get around other than autos; <br />3. Adopt a form based code in the entire downtown area; <br />4. Look at overall park strategy and emphasize improvements and changes that add <br />value to properties in the area. <br />Mr. Marohn will continue with Assets and Challenges for next month. <br />PARK PLAN DISCUSSION: <br />Mr. Marohn explained the Staff Report. A Park Plan needs to be tied to an economic <br />development vision. The Mayor stated the City is having serious issues with the DNR for <br />MINUTES <br />Pequot Lakes Planning Commission <br />June 16, 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.