Laserfiche WebLink
CITY OF PEQUOT LAKES <br /> MONTHLY WATER/WASTEWATER REPORT <br /> November 2007 <br /> Prepared by: Tina Nolden(Water/WW Manager) <br /> WATER PLANT: <br /> Rick,with Advanced Engineering Company, has put in new logic for our flow <br /> totalizers.Now,the computer totals are far more consistent with the actual meter totals. <br /> This will make our yearly totals much more accurate from here on out. <br /> Discovered a problem with the dehumidifier with Karl Moon's help. It took out <br /> one of our GFI outlets. Karl replaced the outlet and I disconnected the dehumidifier for <br /> the time being. I'll have it checked out awhile later since it's not really needed now. <br /> Kurt Rothwell, MMUA Safety Instructor, completed a mock OSHA inspection at <br /> the Water Plant and we did quite well.No major issues. <br /> WATER DISTRIBUTION: <br /> Kurt helped me repair a curb-box at E&P Manufacturing and we put an extension <br /> on one over by the school. Eventually, all curb-boxes will be accessible without having to <br /> dig for them. This will save a lot of time and frustration. <br /> I will be putting flags on the fire hydrants that need them so they can be easily <br /> identified in the snow. <br /> WASTEWATER: <br /> Lance and I added some Lift Station Cleaner/Degreaser to L.S. #2 on Brown and <br /> Heath St. on the 16`h. This helps break up the grease in the lift station and throughout the <br /> sewer lines. <br /> Had a mock OSHA inspection at the Wastewater Plant as well, and just a few <br /> minor issues. Kurt and I repaired the shingles on the blower bldg. <br />