Laserfiche WebLink
Recommendations <br /> • Update the study at least every 2 years. <br /> • Adopt the 2008 rates as proposed. <br /> • Undertake long range planning for a <br /> possible second addition to the Industrial <br /> y, Park and either an expansion or relocation <br /> of the waste water treatment plant. <br /> • Adopt a policy regarding utility connection <br /> fees in conjunction with long range water <br /> and sewer system planning for other areas <br /> of the City. <br /> 15 <br />