Laserfiche WebLink
PROJECT COSTS <br /> Estimated costs for the proposed improvement to the Industrial Park are as follows: <br /> Estimated Construction Cost $529,110.00 <br /> Contingencies (10%) $52,911.00 <br /> Subtotal $582,021.00 <br /> Engineering, Legal, Administration (20%) $116,404.20 <br /> Estimated Project Cost $698,425.20 <br /> The cost estimated contained herein are intended to convey a general and approximate picture of <br /> the costs which will probably be incurred in carrying out the proposed work. Costs can vary <br /> widely depending upon many factors such as weather, economic conditions, size of project, and <br /> the work load of available contractors. Actual costs can only be determined by bidding the <br /> project. Detailed cost estimates are included in the Appendix. <br /> 10 <br />