My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11.01 - Government Drive Project Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2011
>
03-01-2011 Council Meeting
>
11.01 - Government Drive Project Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2014 10:39:52 AM
Creation date
3/13/2014 3:56:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sandy Peine <br />� From: <br />Sent: <br />To: <br />`.. <br />Cc: <br />Subject: <br />Tim Houle [Tim.M.Houle@wsn.us.comJ <br />Saturday, February 12, 2011 3:41 PM <br />Mayor; sjoblad@tds.net; david@allthingsherbal.com; Jessica@moonlitebay.com; <br />journeys@nisswa.net; Tommy Woog; Mark@lakeland-agency.com; Sandy Peine; Mike Loven; <br />Tina Nolden; Dawn Bittner <br />Mike Rude <br />FW: Pequot Lakes - Government Drive - Focus Group List <br />Attachments: Focus Group Contact List.doc <br />Sandy, thank you for the list! The .com was missing from my email address, so I have <br />corrected it on the attached. <br />To bring everyone up to date, I just want to summarize some of the steps that we <br />indicated in our proposal to the City. <br />An overall improvement project can be broken into the following phases: <br />I. Public Input / Preliminary Layouts <br />II. Design <br />III. Bidding <br />IV. Construction (maybe in segments) <br />We are at Phase I, the Public Input / Preliminary Layout phase. <br />In this phase, the Focus Group's initial role will be to review draft material and a <br />handout survey we (WSN) will prepare that will then be presented to the public and <br />properties along the corridor in seeking their input. <br />After this initial meeting with the Focus Group, we (WSN) will prepare for and facilitate a <br />First Public Information / Input Session at which we will present a range of pictures of <br />different street and streetscape elements. We will also prepare and hand out a survey. <br />Next, we will then facilitate a(breakfast) meeting specifically with property owners along <br />this corridor to cover the same items as the First Public Information / Input Session, <br />including asking them to fill out a survey. <br />Next, we plan on meeting with the P&Z Commission to seek their input. <br />After the above three meetings, we will get back together with the Focus Group to <br />review the input and surveys received from the above three meetings and funnel down <br />to a proposed improvement layout. This layout may include an alternative for different <br />components. <br />Next, we will prepare some drawings / exhibits with the proposed improvement layout <br />and alternatives. At this stage we will also prepare a rough cost estimate of these <br />� <br />improvements. <br />We will then meet with the Focus Group to confirm our understanding of and review the <br />information provided to date. At this meeting, we will also discuss the scope of our <br />2/16/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.