My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-13-2012 Park Commission Meeting
Laserfiche
>
Parks
>
Agenda Packets
>
2012
>
09-13-2012 Park Commission Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 10:38:33 AM
Creation date
10/13/2016 10:38:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of MEMO <br /> Pequot <br /> Lakes = <br /> TO: Pequot Lakes Park Board <br /> FROM: Dawn Bittner, Zoning Administrator <br /> Charles Marohn, City Planner <br /> DATE: August 21, 2012 <br /> RE: Sibley Park <br /> At your request Staff and the Planning Commission Vice-Chair visited <br /> Sibley Park last week to offer suggestions for the replacement of the <br /> stairway to the lake. From our observations we offer the following, in no <br /> particular order: <br /> • Replace the existing steps; do not try to reconfigure; <br /> • Use Best Management Practices for erosion control during <br /> construction until all slopes are stabilized; <br /> • Maintain the existing vegetation along the shoreline and allow re- <br /> growth in the Shore Impact Zone; <br /> • Plant short, low growing vegetation on the slopes, to maintain views <br /> of the lake; <br /> • Reduce runoff by planting rain gardens; <br /> • Plant drought resistant deep rooted ground cover on exposed slopes; <br /> • Use pavers in the walkways between sections of stairs. <br /> If you have any questions, please feel free to contact us. <br /> 4638 County Road 11 <br /> Pequot Lakes, MN 56472 <br /> dbittner@pequotlakes-mn.gov <br /> 218-568-6699 <br />
The URL can be used to link to this page
Your browser does not support the video tag.