Laserfiche WebLink
PROPOSED DESCRIPTION <br /> �..- LAND SALE <br /> STATE OF MINNESOTA <br /> TO <br /> CITY OF PEQUOT LAKES <br /> LAND SALE# 18166 <br /> That part of the westerly 150 feet of the former Burlington Northern Railroad Company 250 foot <br /> wide State Ground property at Pequot Lakes, Minnesota, located on the Brainerd to Bemidji <br /> Branch Line right-of-way (now Paul Bunyan State Trail) located within the Northeast Quarter of <br /> the Northeast Quarter Section 15 and the Southeast Quarter of the Southeast Quarter Section 10, <br /> all in Township136 North,Range 29 West, Crow Wing County, Minnesota, lying northerly of <br /> the westerly extension of the southerly right-of-way line of Main Street as laid out and dedicated <br /> in COLE'S PLAT OF PEQUOT, lying southerly of the westerly extension of the northerly right- <br /> of-way line of East Sibley Street as laid out and dedicated in COLE'S PLAT OF PEQUOT,and <br /> lying westerly of a line drawn parallel with and distant 25 17.5 feet westerly of the centerline of <br /> said Paul Bunyan State Trail. <br /> AND <br /> That part of the easterly 100 feet of the former Burlington Northern Railroad Company 250 foot <br /> wide State Ground property at Pequot Lakes, Minnesota, located on the Brainerd to Bemidji <br /> Branch Line right-of-way(now Paul Bunyan State Trail) located within the Northeast Quarter of <br /> the Northeast Quarter Section 15 and the Southeast Quarter of the Southeast Quarter Section 10, <br /> all in Township136 North, Range 29 West, Crow Wing County, Minnesota, lying southerly of <br /> the westerly extension of the northerly right-of-way line of East Sibley Street as laid out and <br /> dedicated in COLE'S PLAT OF PEQUOT, lying northerly of a line drawn parallel with and <br /> distant 700.0 feet southerly from the north line of said Northeast Quarter of the Northeast <br /> Quarter, and lying easterly of a line drawn parallel with and distant 25 17.5 feet easterly of the <br /> centerline of said Paul Bunyan State Trail. <br /> Written by DNR Lands and Minerals Surveyor: Joe Fleisher October 26,2012 <br /> Revised by DNR Lands and Minerals Supervisor: Jodi M. Dehn April 5, 2013 after discussions <br /> with Mayor Nancy Adams and DNR Trails Supervisor, Wade Miller. <br />