My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-2014 Park Commission Meeting
Laserfiche
>
Parks
>
Agenda Packets
>
2014
>
04-10-2014 Park Commission Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 8:40:52 AM
Creation date
10/13/2016 8:40:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Park Board Minutes <br /> April 10, 2014 <br /> Page 2 <br /> Chair Malecha updated the Commission on the progress of the Splash Park. She <br /> explained that she would like to delay applying for the grant until 2015. She noted <br /> that there is more information needed on the project prior to applying for the DNR <br /> grant. <br /> 6. Sibley Lake Park Update <br /> Mike Loven explained that the "Existing Conditions" survey of the park has been <br /> completed by WSN. The Clerk noted that the purpose of the survey was to locate <br /> the improvements that are present at the park for planning purposes. <br /> Mike Loven referenced the bluff on the survey and noted the setback <br /> requirements from the bluff. Mike Loven noted that this setback requirement will <br /> affect the size of the proposed dog park fence by shortening the width of the dog <br /> park area which will make the dog park very small. The Park Commission <br /> requested Mike Loven to contact Sheridan Wilson to review the scaled down size <br /> of the dog park and ask her if it would still be adequate. The Commission <br /> requested Mike Loven to report back to the Park Commission in May. <br /> 7. Council Goal Planning <br /> The City Clerk noted that the Council has determined that the two main park <br /> priorities include updating Sibley Lake Park and construction of an outdoor <br /> skating rink with an overhead roof. Discussion was held regarding the ice skating <br /> rink. The Park Commission noted that it would be difficult to find a location for a <br /> skating rink and that skating rinks require a lot of maintenance and also that the <br /> City may be required to hire a skating rink attendant. <br /> The Park Commission discussed the projects that are currently under <br /> consideration by the Council and/or the Park Commission: <br /> • Upgrade and updating of Sibley Lake Park <br /> • Splash Park <br /> • Playground Equipment at Trailside Park <br /> • Restroom facilities <br /> The Park Commission indicated that it is becoming apparent that the park <br /> projects need to be prioritized and funding sources considered for the projects. It <br /> was the consensus of the Park Commission to address the priorities at the May <br /> Park Commission meeting. <br /> The City Clerk noted that the City Council has requested the Park Commission to <br /> consider increasing the members to seven and to change the meeting time to a <br /> later time. The Park Commissioners requested the City Clerk to review the Park <br /> Commission Ordinance and make an amendment to increase the members. <br />
The URL can be used to link to this page
Your browser does not support the video tag.