My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-10-2015 Park Commission Meeting
Laserfiche
>
Parks
>
Agenda Packets
>
2015
>
09-10-2015 Park Commission Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 3:46:10 PM
Creation date
10/12/2016 3:46:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIBLEY LAKE PARK STEPS <br /> Estimates <br /> Remove and dispose of steps, replace with 4" top soil and erosion control mat - <br /> $11,500 <br /> Crushed concrete delivered onsite - $1,600 <br /> Plus spreading and packing <br /> New steps at south end of trail and new location of fishing pier: <br /> Timbers and nails, materials only— approximately $3,700 <br /> New fishing pier location: <br /> Remove small stairs and haul away - $400 <br /> New steps: <br /> Railing (steel?) - $4,500 <br /> Existing steps: <br /> Remove small wall, build trail and construct small steps at new fishing pier and <br /> new steps at south end of trail — approximately 200 hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.