My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-2015 Park Commission Meeting
Laserfiche
>
Parks
>
Agenda Packets
>
2015
>
03-12-2015 Park Commission Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 3:23:42 PM
Creation date
10/12/2016 3:23:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Park Board Minutes <br /> March 12, 2015 <br /> Page 2 <br /> Mike Loven reported funds for this project: $29,000 in Capital Outlay, $12,300 in <br /> Chokecherry tree sales, $9,000 in Park Light Posts that can be re-designated, <br /> and a donation of$3,500 from Lakes State Bank that has yet to be designated, <br /> resulting in approximately $53,000. <br /> Chair Malecha asked if Commissioner Ronning's proposal could be taken back to <br /> WSN. Council Member Karr stated he would be hesitant to place a limit on their <br /> proposal; the City should take a closer look at what is included. The proposal <br /> includes fielding questions to opening bids. <br /> COMMISSIONER RONNING MOVED TO MEET WITH WSN AND OFFER 10% <br /> OF THE BUILDING COSTS OR A CAP OF $10,000. COMMISSIONER <br /> ETTESVOLD SECONDED THE MOTION. THE MOTION CARRIED 6-0. <br /> It was the consensus of the Park Board that Commissioner Ronning and Mike <br /> Loven would meet with WSN to discuss the proposal. <br /> 5. Playground Fence <br /> Commissioner Ettesvold introduced new Commission Member Ashley Nordby. <br /> Commissioner Ettesvold presented several styles of fencing. It was the <br /> consensus of the Park Board to construct fencing on two sides, along the <br /> highway and the north end, and a short angle on the south end, 4 feet high. The <br /> fence would be constructed 10-feet from the playground. There would be room <br /> for benches and picnic tables. <br /> Pro-Build has stated the lumber yard would sell the fencing to the City for cost. <br /> Commissioner Ettesvold will obtain a new drawing indicating the location of the <br /> playground and fencing to present to MN/DOT to receive permission to place <br /> fence within MN/DOT right-of-way. <br /> Mile Loven will schedule playground construction and will present the schedule at <br /> the April meeting. Chair Malecha stated Costco will provide food for volunteers <br /> and will need to be notified in advance. <br /> It was suggested similar fencing could be constructed around the Bean Hole Pit. <br /> Mike Loven stated the final figures will be presented next month. <br /> 6. Assignment of$3,500 Donation <br /> Commissioner Ronning stated he visited Sibley Lake Park and noted the railing <br /> down the steps is in bad shape. Council Member Karr stated the money should <br /> be used on a project that it will pay for the majority of the project, rather than be <br /> put toward an $80,000 project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.