My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-21-2015 EDC Meeting
Laserfiche
>
Economic Development (Permanent)
>
EDC Agenda Packets
>
2015
>
07-21-2015 EDC Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 1:56:38 PM
Creation date
10/12/2016 1:56:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pequot Lakes Intercept Survey Results Region Five <br /> DEVELOPMENT COMMISSION <br /> Introduction <br /> The Pequot Lakes community requested the assistance to of the Region Five <br /> Commission in surveying its residents, businesses, and visitors in the late summer of 2007. <br /> A community group met on Tuesday, August 7, 2007 and determined that three pieces <br /> of additional information would be useful to the business community and residents who <br /> are faced with a pending decision related to the expansion of MN 371. Obtaining <br /> information related to the nature and composition of visitors to Pequot Lakes business <br /> district. This report documents the effort to gather this information through the use of an <br /> intercept survey of visitors to the city. <br /> Methodology <br /> An intercept survey is a survey conducted by "intercepting" people as they go about <br /> their normal activities. Respondents are stopped by surveyors and asked to take a few <br /> minutes to answer a few questions related to the nature of their visit. Our surveyors <br /> where stationed at 5 locations around Pequot Lakes consisting of: the one block in front <br /> Sibley Station on Government Drive, the two blocks in front of the Legion and Leslie's <br /> along the north side of Main street, in front of Thurlow's Hardware on Front street, <br /> outside the Oasis on Hwy 371, and rotated the fifth location between the entrance of <br /> the Lakes Latte shop and the Post Office on the west side of Hwy 371 on Main street. <br /> The surveys were conducted on the following dates: Tuesday, August 21, Wednesday, <br /> August 22, Friday, August 24, and Saturday, August 25th, 2007. Two days where chosen <br /> during the normal workweek and two during the weekend, in an effort to account for <br /> the predicted difference in foot traffic between weekend days. <br /> The surveys were collected between the hours of 11:30 a.m. to 4:30 p.m. by four of the <br /> surveyors and between 9:00 a.m. to 2:00 p.m. by one of the surveyors on the identified <br /> days. The weather was consistently sunny and fair during survey hours with the <br /> exception of Tuesday, August 21 when it rained for two hours. <br /> The survey questions used came from a collaborative effort involving the Pequot Lakes <br /> community. The questions were refined and agreed upon before the survey was <br /> administered. <br /> Incentives were used to ensure that surveyors achieved the maximum possible number <br /> of responses. The goal was for each data collector to take a survey every 10 minutes. <br /> �.. 6 surveys an hr x 5 hrs a day = 30 surveys a day, x 4 days = 120 surveys per person, x 5 <br /> data collectors = 600 surveys) All data collectors reached their goal. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.