Laserfiche WebLink
Planning ahead <br /> Many highway construction projects have a Getting organized <br /> design phase of five or more years. This is The key to survival is bringing businesses <br /> the time when MnDOT engineers, in and the affected stakeholders together <br /> cooperation with local government officials, early and working together to survive <br /> plan the project, define the scope of what economically while the infrastructure is <br /> will be accomplished, study the alternatives improved. A local chamber of commerce or <br /> available,evaluate the impacts on the business association often becomes the <br /> community or neighborhood, and design the focal point as business people get organized. <br /> plans that a contractor will need to finish the A leader can be identified to represent the <br /> improvement. Occasionally, MnDOT hires business community to keep business <br /> consulting engineering firms to design the concerns in mind, to channel questions <br /> improvement,and sometimes to manage or suggestions to MnDOT and to carry <br /> its construction. information back to the businesses. <br /> Sometimes, a smaller group or committee <br /> is formed to specifically represent those <br /> ONS RU ION who are most affected by the construction. <br /> SPECIAL -ry Working cooperatively as a group has <br /> EVERYDAY 11- 2 PM advantages. Together, the business <br /> D B L, CHEESE �• community has the synergy to accomplish -� <br /> SMALLu more than its individual members could <br /> FRY accomplish on their own. Resources and <br /> SMALLPOP O P ideas can be pooled for the maximum <br /> '�( benefit. Working together saves time ONLY 111` and money in the long run. <br /> Throughout this design phase, MnDOT <br /> holds periodic meetings with local officials <br /> and citizens to hear their suggestions and <br /> concerns. By the time the construction crew <br /> rolls on-site, all of the design decisions have <br /> been made. It's important,therefore, for the <br /> business community to get involved early in <br /> the design phase and stay involved <br /> during construction. <br /> _, al 5t8ate OPEN FOR <br /> j Mall BUSINESS USINESS �, : . <br /> r#^ -- al- • 3 — <br /> .. 4. <br /> 4 <br />