Laserfiche WebLink
Page 3 of 3 <br />owners participating, it is more economical for the property owners themselves to arrange for <br />and pay for the paving themselves. Then a decision would need to be made. Does it stay a <br />� private street (with whichever property owners that would be willing, contributing to its <br />maintenance), or, does the City verify during construction that it is properly constructed and an <br />acceptable road before considering taking it over as a City street? <br />� <br />� <br />+ Do you really want to make this particular segment of road a City street and take over long- <br />term maintenance? <br />I can answer more questions or look into other issues / options if you would like. Or, maybe <br />you want to consult with the City Attorney. <br />If someone at the City wants to direct me, I can talk with Dall. <br />Timothy M. Houle, PE <br />Civil Engineer, Vice President , <br />Tel: 218-316-3646 ��-� ? <br />Cel I: 218-820-7479 <br />tim.m.houle@wsn.us.com N/ �pSETI� <br />7804 Industrial Park Road h1CI H <br />S -- --- <br />Baxter, MN 56425-2720 N«r ��_trv_c <br />www.wsn.us.com <br />Download My Contact Information as V-Card <br />engineering � architecture � land surveying � environmental services <br />� Please consider the environment before printing <br />This email and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed. If <br />you are NOT the intended recipient or the person responsible for delivering the e-mail to the intended recipient, be advised that you have received this <br />e-mail in error and that any use, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited. <br />This email has been scanned for viruses by Widseth Smith Nolting using FortinetTM and TrendMicroT"' Anti-Virus Technologies. <br />1 /26/2011 <br />