My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-18-2003 Planning Commission Minutes
Laserfiche
>
Planning & Zoning
>
Minutes
>
2003
>
09-18-2003 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2016 9:29:04 AM
Creation date
10/3/2016 9:29:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br /> PEQUOT LAKES PLANNING AND ZONING COMMISSION <br /> SEPTEMBER 18, 2003 <br /> PRESENT: Bill Habein, Marty Nelson, Cheri Seils, Joe Dotty, Karl Moon and <br /> John Derksen. ABSENT: Mark HaIlan and Tom Woog. <br /> PLANNING AND ZONING ADMINISTRATOR: Beth Elliott, Community Growth <br /> Institute. Charles Marohn was on vacation. <br /> The meeting was called to order by Vice-Chair Karl Moon at 6:34 p.m. <br /> APPLICANT: Marian Beck <br /> Applicant requests a metes and bounds subdivision in the Urban Residential <br /> District. <br /> Applicant was present— Marian Beck, 15893 Winterwood Trail, Brainerd, MN. <br /> Ms. Elliott explained the Staff Report. The Staff Report included a possible <br /> condition regarding the gravel driveway on the east lot be removed and replaced <br /> with sod or grass seed. Mrs. Beck stated that it really wasn't a gravel driveway, <br /> but just a dirt area where people had driven and would potentially be excavated <br /> when a new home were constructed on the lot. <br /> A motion was made by Bill Habein, seconded by Joe Dotty, to approve the metes <br /> and bounds subdivision. All members voted "aye". Motion carried. <br /> APPLICANT: Pequot Lakes Baptist Church <br /> Applicant request rezoning in the Industrial District to some type of residential or <br /> commercial zoning for the expansion of the church. <br /> Applicant was present— Speaker for the church was Wayne Anderson, 2665 — <br /> 36t Avenue S. W., Pine River, MN. <br /> Ms. Elliott explained the Staff Report and the different zoning classifications. <br /> Mr. Anderson offered background information. The church purchased the <br /> original 5 acre parcel for $1.00 in January, 1982. The new church was <br /> completed in 1990 and is presently zoned R-1. In August, 1996, the City of <br /> Pequot Lakes created the Industrial Park. The 5 acres belonging to the church <br /> was marked on the plat of the Park as "Not In Plat". The Industrial Park was <br />
The URL can be used to link to this page
Your browser does not support the video tag.