Laserfiche WebLink
City of Pequot Lakes <br /> WAC &SAC Assistance <br /> July 19, 2012, 8:30 a.m. Committee Meeting <br /> Pequot Lakes City Hall <br /> We have not included this entire document herein, but have included from it Appendix A: <br /> SAC Criteria for Commercial Properties which gives the SAC amount for various non- <br /> residential types of establishments. <br /> Changing the Appendix A for"local situations", or adjusting ERCs/SAC/WAC, <br /> especially for larger developments (i.e. maybe a sliding scale; e.g. 90%of the calculated <br /> ERC when the calculated ERC is over 10, 80%of the calculated ERC when the <br /> calculated ERC is over 20, etc.) is a City-by-City decision. <br /> Please NOTE that this draft language, if acceptable, should definitely be reviewed by the <br /> City Attorney so that it can be properly formatted and included in these two Ordinances. <br /> Comments? <br /> WAC and SAC amounts <br /> Cities use many financial methods to determine the actual dollar amount for each WAC <br /> unit and each SAC unit. <br /> Our proposal to the City to assist them on this task was based on keeping this <br /> methodology as simple as possible. This should aid in repeating it for future periodic re- <br /> calculations. <br /> Should the City desire a more refined method—and many more variables can be <br /> considered- a financial consultant should be hired. <br /> Before getting to the proposed method of calculating the WAC and SAC, attached is a <br /> graphic simplification of the City's wastewater system. A similar one can be prepared for <br /> the City's water system. The graphic depicts the components of a system- each of which <br /> has initial costs, operation and maintenance(O&M) costs, and eventual future <br /> replacement costs. Every City pays for these costs via different charges(some with others <br /> not shown) as well as different splits between such charges. <br /> If SAC and WAC were not implemented from the beginning of a system, a city needs to <br /> decide if they are going to spread the costs out based on the whole system capacity and <br /> hook-ups(as if WAC and SAC fees were being collected from the beginning), or just <br /> spread the costs out based on remaining system capacity and hook-ups. <br /> SAC Calculations <br /> An important variable is the capital cost of the wastewater system that the SAC is being <br /> applied to. <br /> Wastewater capital costs can include lift stations, stabilization ponds, pond structures, <br /> blowers and aeration system, spray irrigation/disposal, land, engineering, administrative, <br /> Page2of4 <br /> J.\0130B•Citq of Pequot Lakes\013011004S-WAC&SAC Assistance\0130BOO1S.000-WAC&SAC Assistance\Comspondence\20120719 Committee meeting handout.doc <br />