My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-29-2013 EDC Meeting
Laserfiche
>
Economic Development (Permanent)
>
EDC Agenda Packets
>
2013
>
02-29-2013 EDC Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2016 8:38:12 AM
Creation date
10/3/2016 8:38:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> Sandy Peine <br /> From: Tim Houle [Tim.M.Houle @wsn.us.com] <br /> Sent: Friday, January 25, 2013 4:58 PM <br /> To: Sandy Peine <br /> Cc: Mike Loven; Mike Rude <br /> Subject: Pequot Lakes-WAC & SAC from other cities <br /> Sandy, <br /> On the above Subject, we did some file searching (when we are City Engineers), phone <br /> calling, emailing, and webpage searching. From a combination of these (each with <br /> varying levels of current updates), following is what we found out: <br /> Wastewater <br /> Baxter = Residential SAC = $3,000 per ERC; Commercial SAC = $3,400 per ERC <br /> Brainerd = SAC = $1,900 per ERC <br /> Breezy Point = SAC = $3,250 per ERC <br /> Crosby = sewer tapping fee = $500 (not sure if this is per ERC) <br /> Deerwood = hookup fee = $400 (not sure if this is per ERC) <br /> Nisswa = SAC = $7,100 per ERC <br /> Pillager = SAC = $1,000 per ERC <br /> Pine River: Residential SAC = $1,600; Commercial and Industrial SAC = $3,400 <br /> (believe these are per ERC) <br /> `. Water <br /> Baxter = Residential WAC = $2,800 per ERC; Commercial WAC = $3,100 per ERC <br /> Brainerd = WAC = $1,400 per ERC <br /> Breezy Point = no water system <br /> Crosby = water tapping fee = $500 (not sure if this is per ERC) <br /> Deerwood = hookup fee = $600 (not sure if this is per ERC) <br /> Nisswa = no water system <br /> Pillager = WAC = $1,000 per ERC <br /> Pine River = fee is $250 + either $2,000 for water or sewer connection in black top; <br /> $3,000 for water and sewer connection in black top; $700 for water or sewer connection <br /> in gravel; or $1,200 for water and sewer connection in gravel (not sure if these are per <br /> ERC) <br /> Sandy, I believe Pequot Lakes' present amounts are as follows (although I am still not <br /> clear if it is per ERC or not): <br /> SAC = $8,000 <br /> WAC = $2,200 <br /> Our previous calculations had two options: use full system capacity or use remaining <br /> system capacity. The proposed amounts worked out as follows: <br /> SAC full system capacity = $3,090 per ERC <br /> SAC remaining capacity = $6,310 per ERC <br /> `.- WAC full system capacity = $1,890 per ERC <br /> WAC remaining capacity = $2,900 per ERC <br /> 1/28/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.