Laserfiche WebLink
� <br />2. Routine Maintenance and Inspection Goals <br />A. Sanitary Sewer Mains <br />Scope of City's Responsibility — The City will maintain the components of the public <br />sanitary sewer system. This includes sanitary sewer mains, manholes, lift stations and the <br />wastewater treatment plant. Private property owners are responsible for the maintenance <br />of sanitary sewer components from their property up to and including the connection to <br />the public sewer system. <br />Schedule — The City's goal is to inspect and maintain the components of its sanitary <br />sewer system according to the attached Sanitary Sewer System Map. <br />Equipment - The equipment used to perform maintenance will depend upon the <br />equipment available and its effectiveness as determined by qualified staff. <br />Television Inspection — The City's sanitary sewer mains will be inspected by television <br />camera when we have problems/concerns about the line. Sanitary sewer mains in a new <br />development must be televised before said mains are turned over to the City. In addition, <br />the City may require any main near a construction site to be televised before and after the <br />construction. <br />Visual recordings of sewer main televising will be required of any vendor performing this <br />�— service for the City. A written report summarizing and interpreting the findings of the <br />televising will also be required. These records will be kept by the City for a minimum of <br />12 years. <br />� <br />B. Problem Areas � <br />The sanitary sewer mains and facilities identified as Category 1 will receive ordinary <br />routine maintenance as noted on sewer maps. The sanitary sewer mains and facilities <br />identified'on the Sanitary Sewer System Map as Category 2 will receive more frequent <br />maintenance and those identified as Category 3 will receive less frequent maintenance. <br />When a sewer main or facility is identified as anything other than Category 1, the reasons <br />why maintenance is needed on a different schedule will be documented. Sewer mains and <br />facilities will receive maintenance according to the attached schedule. <br />The Wastewater Manager will determine whether a main or facility is Category 1, <br />receiving routine sewer maintenance, Category 2, receiving more frequent maintenance <br />or Category 3, receiving less frequent maintenance. Based on periodic assessment, <br />maintenance will be adjusted and a sewer main may be moved from one category to <br />another. <br />2 <br />