Laserfiche WebLink
WIDSETH SMITH NOLTING <br />2014 FEE SCHEDULE <br />. • <br />Engineer/Architect/Survexor/Scientist/Wetland SRecialist/Geaaraoher <br />Level I $86.00 <br />Level II <br />Level III <br />Level IV <br />Level V <br />Technician <br />Level I <br />Level II <br />Level III <br />Level IV <br />Levei V <br />$101.OQ <br />$123.00 <br />$135.00 <br />$149.00 <br />$54.00 <br />$67,OQ <br />$83.00 <br />$96.00 <br />$102.OQ <br />Computer Systems Specialist $115.00 <br />Senior Funding Specialist $92.00 <br />Marketing Specialist $90.00 <br />Funding Specialist $75.00 <br />Administrative Assistant $50.00 <br />�.t�� <br />• <br />Mileage (Federal 5tandard Rate) sua�ecttochan9e $0.56/mile <br />Meals/Lodging Cost <br />Stakes & Expendable Materials Cost <br />Waste Water Sampler <br />ISCO Flow Recorder <br />Photoionization Detection Meter <br />Explosimeter <br />Product Recovery Equipmenk <br />Survey-Grade GPS (Global Positioning System) <br />Mapping GPS (Global Positioning System) <br />Soil Drilling Rig <br />Groundwater Sampling Equipment <br />Subcontractors <br />$40.00/Day <br />$60.00/Day <br />$80.00/Day <br />$50.00/Day <br />$35.00/Day <br />$75.00/Hour <br />$150.00/Day <br />$35.00/Hour <br />$75.00/Day <br />Cost Plus 10% <br />