Laserfiche WebLink
Commission Member Hallan stated the DNR evaluates the lake and even if a beach is <br />approved by the City, the DNR can deny removal of emergent vegetation. Mr. Steffens <br />stated that if the Planning Commission agrees to the beach area, that will go a long way <br />for a permit to remove emergent vegetation. Commission Member Hallan stated the <br />DNR could say they cannot clear anything. <br />Wayne Mueller, DNR Aquatic Specialist, stated the upland use does not influence the <br />opinion or view of aquatic use; there is no leverage. The DNR is concerned for the lake. <br />Commission Member Habein asked Mr. Steffens how many feet was requested for the <br />new beach. Mr. Steffens replied he is requesting �5o feet on the east side, with i75 feet <br />on the west side. He further stated if the property was subdivided by lot and block he <br />would have a lot more beach. <br />Tom Seaver reminded the Planning Commission that pictures had already been <br />submitted of that area when it was the previous resort; there were no beaches. <br />Virginia Arbuckle, Middle Cullen Road — Requested what boat traffic will do to the lake. <br />Mr. Mueller stated that watercraft does damage vegetation. That is why the docks were <br />designed to not impact vegetation. <br />Phil Reichenbach stated the old docks were not removed when the new ones were put in. <br />Mr. Steffens stated that he is decreasing number of units so this project will be <br />responsible for less number of boats. Regarding the dock issue, 4o slips have not been <br />built; dock number still below number allowed. <br />Virginia Arbuckle stated that reeds were cut down. Mr. Steffens acknowledged being <br />issued a citation and that he will be in court in February. <br />Mr. Burslie stated the Preliminary Plat was returned as incomplete. Staff <br />recommendation is still to table application; we would like to draft Findings of Fact and <br />Conditions and get the Preliminary Plat application in ne� month. Mr. Steffens stated <br />he needs more de�nitive input. Mr. Burslie informed him that the City needs to run the <br />CUP and Preliminary Plat together so the Planning Commission can see the whole plan <br />as one. Mr. Steffens stated that is very costly until he receives some indication as to <br />what was discussed at this meeting. He further stated that everything he has asked for is <br />in the ordinance and the DNR has the regulations that allows him to clear 25% of <br />shoreline in a commercial resort area; he is trying to make the resort work. He thinks he <br />did a good job not impacting the Shore Impact Zone. <br />Minutes <br />Pequot Lakes Planning Commission <br />January i6, 2oi4 11 <br />