My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03 - Conditional Use Permit for an Extrative Use - Bauerly Brothers
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2005
>
09-07-2005 Special Planning and Zoning Meeting
>
03 - Conditional Use Permit for an Extrative Use - Bauerly Brothers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2016 9:27:25 AM
Creation date
7/29/2016 9:26:05 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STAFF REPORT <br /> Application: Conditional Use Permit for an Extractive Use <br /> Applicant: Bauerly Brothers,Inc. <br /> Background: The property in question is located in the northeastern part of the City on Wild <br /> Acres Road and is currently zoned Agriculture.The lot is approximately forty(40) acres in size <br /> and currently has several structures on the property. <br /> The applicant proposes to use approximately 3.o acres of the site to excavate approximately <br /> 40,000 cubic yards of Class V material and to process gravel materials for the construction of <br /> local, state, and township roadways, specifically for the County Road i project. The applicant <br /> proposes to remove the material through excavation, without using blasting or explosives. The <br /> operation will include the use of portable aggregate crushing equipment, screens, feed, and <br /> stacking conveyors.Dump trucks and belly dumps will be used to haul the material. <br /> The topsoil removed to excavate the needed material will be stored as berms around the <br /> excavation site and in the stockpile area indicated on the plans.After excavation is complete,the <br /> bermed soil will be replaced at 3 to 4 inches over the site after sloping has been completed and <br /> the site will be reseeded with pasture mix. The applicant proposes to remove all excavation <br /> equipment and remove,bury,or burn all natural waste material in accordance with fire warden <br /> and local solid waste requirements. No hazardous will be handled with the proposed use and <br /> chemical substances will not be a part of the excavation or mining process. <br /> The applicant proposes to use Wild Acres Road, bordering on the north, as the primary haul <br /> route for this project. The applicant is also requesting to operate 24 hours per day, with no <br /> operations on Sundays or holidays. <br /> I <br /> At this time, the applicant does not have long-term plans for excavation operations and has <br /> indicated that the excavation operations would specifically be for the County Road 1 project.The <br /> �•e �S.5 7^. ` i <br /> Bauerly Bros.,Inc Special Meeting 1 <br /> September 7,2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.