STORM WATER POLLUTION PREVENTION PLAN <br />Project Location: <br />The 2014 North Washington Street Improvements are located in Crow Wing County, <br />Section 10 Township 136 N., Range 29 W. within the City of Pequot Lakes. The length <br />of the roadway is 390 feet. <br />Existing Site Description: <br />The project area is an established City street that serves both residential and <br />commercial properties along its corridor. The bituminous surfaced roadway has an <br />existing storm sewer system with one inlet drain that collects stormwater and flows into <br />an existing storm sewer system along Main Street (County Road 11). The yards <br />adjacent to the roadway are generally flat and any stormwater perculates into the <br />granular soil. <br />Proposed Project Description: <br />The estimated length of the proposed project is 390 lineal feet (0.07 miles). The <br />improvement will contain a two-lane urban curb and gutter roadway section with parking <br />areas along both sides of roadway. There will be vertical adjustments to the centerline <br />profile to aid the drainage from adjacent yards into the new roadway. The curb and <br />gutter along the new roadway will vary in width from 35 feet to 55 feet from face of curb <br />to face of curb. The south half of the roadway will cross drain from the east curbline to a <br />swale line where the west lane of roadway and parking area meet. A new storm serwer <br />system will be installed with drain inlets along the west gutterline and at a low point in <br />the west parking area. The new storm sewer system will flow and connect to an existing <br />drainage structure that is part of an existing system along Main Street (County Road 11). <br />Lastly, the existing sanitary sewer pipe that flows from Oriole Street to Main Street will <br />be replaced. <br />The total area disturbed for these improvements is 29,722 s.f. (0.68 acres). Existing <br />impervious surfaces within the project, including bituminous roadway, bituminous <br />driveways, concrete driveways, concrete sidewalks and gravel driveways is estimated at <br />21852 s.f. (0.50 acres). The proposed impervious surfaces for the project area are <br />estimated at 24947 s.f. (0.57 acres). An overall increase of 0.07 acres of impervious <br />surface will be added to the project area. Hydraulic calculations have been performed <br />to size the proposed storm sewer collection system. <br />Unique Storm Water Management Features <br />No unique storm water management features will be necessary for this project. <br />TMDL Impiementation Plans Containing Storm Water Requirements <br />Not Applicable <br />Long Term Maintenance <br />Long term maintenance of the permanent storm water management system will be by <br />the City of Pequot Lakes Maintenance Department personnel. <br />Erosion Control Supervisor Requirements <br />The Contractor must identify an Erosion Control Supervisor (ECS) who is <br />knowledgeable and experienced in the application of erosion and sediment control Best <br />Management Practices (BMP's). The ECS must work with the Project Engineer to <br />oversee and implement the SWPPP, and the installation, inspection, and maintenance <br />of erosion and sediment control BMP's before, during and after construction. The <br />Contractor/ECS is required to comply with the training requirements in Part III.A of the <br />NPDES Permit. The permittee(s) shall ensure that employees are properly trained in <br />the following areas with certification proof provided at the pre-construction conference. <br />SWPPP Preparation: <br />Name: Patrick M. Beste <br />Dates of Training: Janual'y 11, 2012 - Univ. of Minnesota <br />Instructors Name providing Training: J. Chapman, T. Smlth <br />Content of Training (incl. hours): Desiqn of SWPPP (Recertification) - 8 hrs. <br />Site Manager: <br />Name: <br />Dates of Training: <br />Instructors Name providing Training: <br />Content of Training (incl. hours): <br />BMP Installer: <br />Name: <br />Dates of Training: <br />Instructors Name providing Training: <br />Content of Training (incl. hours): <br />The Contractor/ECS shall develop a chain of responsibility with all operators on the <br />site to ensure that the SWPPP will be implemented and stay in effect until the project <br />site has undergone Final Stabilization in accordance with Part IV.G of the NPDES <br />Permit and a Notice of Termination (NOT) has been submitted to the MPCA in <br />accordance with Part II.0 of the NPDES Permit. The Contractor/ECS must routinely <br />inspect the entire construction site at least once every seven days during active <br />construction and within 24 hours after a rainfall event greater that 0.5 inch in 24 hours. <br />The Contractor shall take action to eliminate any deficiencies found during these <br />inspections and contact the MPCA if contaminated stormwater has reached any surface <br />water. The Contractor must provide 2 rain gauges to be installed on the construction <br />site. Inspections, maintenance and documentation must be in accordance with the <br />NPDES Permit Part IV.E. See Part III.D of the NPDES Permit for record retention <br />requirements. Copies of the inspection records are to be submitted to the Engineer. <br />The Contractor/ECS or Project Engineer must amend the SWPPP as necessary to <br />include additional requirements, such as additional or modified BMP's, designed to <br />correct prob�ems or address situations in accordance with Part III.A.5 of the NPDES <br />Permit. <br />�<� <br />����� <br />��w�w <br />U W U O U <br />� Z � W � <br />�w��o <br />< Q�� <br />�o� <br />zzW <br />wa� <br />oJ� <br />> <br />Z <br />w <br />u <br />z <br />w F�� <br />0 <br />� �,z <br />- 3`� <br />a� <br />�g <br />w3� <br />� m <br />� <br />� <br />� <br />w <br />Y <br />Q <br />F- <br />O <br />� <br />C3 <br />w <br />a <br />� <br />O <br />} <br />F- <br />U <br />a <br />� <br />0 <br />� <br />w <br />z <br />Z <br />� <br />� <br />W <br />Y <br />Q <br />J <br />H <br />O <br />� <br />C7 <br />w <br />d <br />J_\0130B-GityotPequotLakes\0130B0051-PaquotLakes-NWasM1ingionlmprovamen�s\0130B0051000.PaquotLakes-NWasM1ingtonlmprovemen�s\CNO�\CrvillC-SWPPPNara�ive-0130B0051.dwg Plottetlby_PatBesta 112 8/2 014 1'.39'.38PM 02013WIDSETHSMITHNOLTING 9HEETHEyOf�9 <br />